WELL · 42-083-36103 · DISTRICT 7

Hemphill 83 #2

Y

Coleman County · Mary Opal (Gray Sand) field · Injection  · Vertical

Hemphill 83 #2 (API 42-083-36103) is a well in Coleman County operated by Window Operating CO. The, completed January 28, 2025 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued December 3, 2013, permitted to 4,000 ft.

Completion filings report 12 formation tops, including Coleman Junction, Winchell Lime - Disposal, Breneke Sand - Disposal, Canyon.

Its lease has reported 145K barrels of oil and 563K mcf of gas since February 2014, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 25.8K barrels injected in the 12 months reported through March 2026.

Operator of record

Window Operating Co. The

Coleman, TX · P-5 Y, filed Jul 4, 2026 · 114 permits on file · (325) 636-3608

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWindow Operating Co. The
Production reportsWindow Operating Co., Thethrough Apr 2026
Latest permitWindow Operating Co., TheDec 3, 2013
4,000
total depth, ft
1
permits on file
Dec 3, 2013
last permit issued
Jan 28, 2025
completed
145K
cumulative oil, bbl
563K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 28, 2025
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hemphill 83 O-8-31420Mary Opal (Gray Sand)Window Operating Co., The8145K563KFeb 2014 – Jul 2026

Oil, barrels lease total

Last 12 months 2,630 · prior 12 3,657(-28%)

0200400600202420252026

Gas, mcf lease total

Last 12 months 8,837 · prior 12 26,624(-67%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Window Operating Co., TheFeb 2014 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
773864-99DrillWindow Operating Co., TheNov 14, 2013Dec 3, 2013Jan 9, 20144,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-31420————

Formation tops

As filed on W-2/G-1. Subsea from 1,776 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction3601,416
Coleman Junction6001,176
Winchell Lime - Disposal1,966-190
Breneke Sand - Disposal——
CanyonCANYON REEF - DISPOSAL——
Capps Lime - Disposal——
Cook Sand - Disposal——
Crosscut Upper - Disposal——
EllenburgerELLENBURGER - DISPOSAL——
Jennings - Disposal——
King Sand - Disposal——
Overall - Disposal——
TannehillTANNEHILL - DISPOSAL——
Winchell Lime - Disposal——

Perforations

Perforated and open-hole intervals.

FromToType
3,0243,034Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62516312.25125 S
4.53,1667.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 15, 2025Feb 4, 2025—
00Mar 5, 2014Mar 4, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

25.8K
bbl, last 12 reported months
25.8K
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000127079H-1 InjectionActive3001,0003,024–3,034

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 25,845

01K2K3K2026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08336103, documented in the API reference.