WELL · 42-083-36155 · DISTRICT 7

Ellis #1

Y

Coleman County · Burt-Ogden-Mabee (Jennings) field · Producing  · Vertical

Ellis #1 (API 42-083-36155) is a well in Coleman County operated by Tam2 Squared Operating LLC, completed May 5, 2015 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued March 6, 2015, permitted to 3,800 ft.

It was permitted by Valley Petroleum Company and has since transferred to Tam2 Squared Operating LLC on the wellbore schedule.

Completion filings report 10 formation tops, including Coleman Junction, Overall - Disposal, Canyon, Breneke Sand - Disposal.

Its lease has reported 3.92K barrels of oil and 37K mcf of gas since May 2015, last reporting in July 2026.

Operator of record

TAM2 Squared Operating LLC

Permitted by Valley Petroleum Company; the EWA schedule now lists a different operator.

Rockwall, TX · P-5 Y, filed Feb 4, 2026 · 12 permits on file · (214) 460-9326

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTAM2 Squared Operating LLC
Production reportsTAM2 Squared Operating, LLCthrough Apr 2026
Latest permitValley Petroleum CompanyMar 6, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,800
total depth, ft
1
permits on file
Mar 6, 2015
last permit issued
May 5, 2015
completed
3.92K
cumulative oil, bbl
37K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 5, 2015
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Ellis O-8-31814Burt-Ogden-Mabee (Jennings)TAM2 Squared Operating, LLC13.92K37KMay 2015 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

05001K1.5K202420252026

Oil, barrels lease total

Last 12 months 31 · prior 12 59(-47%)

051015202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Valley Petroleum CompanyMay 2015 → Aug 2017
  2. 2TAM2 Squared Operating, LLCSep 2017 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
804310-99DrillValley Petroleum CompanyMar 4, 2015Mar 6, 2015Mar 28, 20153,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-31814————

Formation tops

As filed on W-2/G-1. Subsea from 1,954 ft elevation.Download CSV →

FormationMD ftSubsea
Coleman Junction970984
Overall - Disposal2,250-296
CanyonCANYON REEF - DISPOSAL3,000-1,046
Breneke Sand - Disposal3,270-1,316
Capps Lime - Disposal3,304-1,350
Cook Sand - Disposal——
Crosscut Upper - Disposal——
King Sand - Disposal——
TannehillTANNEHILL - DISPOSAL——
Winchell Lime - Disposal——

Perforations

Perforated and open-hole intervals.

FromToType
3,5723,576Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512412.2575 S
4.53,6817.875650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 24, 2015Jun 9, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08336155, documented in the API reference.