TEXAS · WELLS · COLORADO COUNTY · TAIT, MATILDA "A" LEASE · API 42-089-00202 · DISTRICT 03
Tait Matilda A #2
Colorado County · Altair (Yegua) field · Temp Abandoned · Vertical
Tait Matilda A #2 (API 42-089-00202) is a well in Colorado County operated by Proline Energy Resources Inc, completed February 21, 1986 and listed as temp abandoned on the RRC schedule, shut in January 1, 1998.
The RRC has issued one drilling permit, issued October 8, 1985, permitted to 9,286 ft.
It was permitted by Superior Oil Company, The and has since transferred to Proline Energy Resources Inc on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Superior Oil Company, The; the EWA schedule now lists a different operator.
- Based in
- Sugar Land, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 16, 2025
- Phone
- (832) 886-4420
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Superior Oil Company The |
| Production reports | none |
| Latest permit | Superior Oil Company, TheOct 8, 1985 |
- 9,286
- total depth, ft
- 1
- permits on file
- Oct 8, 1985
- last permit issued
- Feb 21, 1986
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 21, 1986
- Shut in
- Jan 1, 1998
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Tait, Matilda "A" G-3-120707 | Altair (Yegua) | Proline Energy Resources Inc | 1 | 0 | 0 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 286944-99 | Recompletion | Superior Oil Company, The | Jan 16, 1986 | Oct 8, 1985 | — | 9,286 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 21, 1986 | Tait Matilda A G-3-120707 | Altair (Yegua) | Proline Energy Resources Inc | Temp Abandoned · shut in Jan 1, 1998 | 9,286 |
| Aug 4, 1977 | M. Tait -A- O-3-11486 | Altair (Wilcox 8 300) | Mobil Producing TX. & N.M. Inc. | Not on Schedule | — |
| Jul 1, 1945 | Tate Matilda -A- G-3-4911 | Altair (Wilcox 8 300) | Superior Oil Company The | Not on Schedule | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,057 | 6,062 | Perforated |
| 8,256 | 8,268 | Perforated |
| — | 8,303 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 1,202 | — | — |
| 7 | 8,428 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 1, 1986 | Mar 11, 1986 | Yes |
| 00 | Apr 16, 1986 | — | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-00202 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-00202 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08900202, documented in the API reference.