WELL · 42-089-00554 · DISTRICT 3
Sheridan Gas Unit #5
Colorado County · Sheridan (Wilcox -H-) field · Vertical
Sheridan Gas Unit #5 (API 42-089-00554) is a well in Colorado County operated by Dominion Expl. & Prod. Inc., completed May 20, 1982.
The RRC has issued 2 drilling permits between 1978 and 2003, permitted to 12,200 ft.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 30, 2007
- Permits on file
- 271
- Phone
- (713) 756-6000
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dominion Expl. & Prod. Inc. |
| Production reports | Shell Western E&P Inc.through Apr 1998 |
| Latest permit | Dominion Expl. & Prod., Inc.Feb 10, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,200
- total depth, ft
- 2
- permits on file
- Feb 10, 2003
- last permit issued
- May 20, 1982
- completed
- 0
- cumulative oil, bbl
- 342K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 20, 1982
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sheridan Gas Unit G-3-195636 | Sheridan (Wilcox Consolidated) | Remora Management, LLC | 1 | 0 | 0 | Feb 2003 – Jul 2026 |
| Sheridan Gas Unit G-3-79129 | Sheridan (Wilcox -H-) | Dominion Expl. & Prod., Inc. | 1 | 0 | 342K | Jan 1993 – Feb 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Shell Western E&P Inc.Jan 1993 → Apr 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 528297-99 | Recompletion | Dominion Expl. & Prod., Inc. | Feb 10, 2003 | Feb 10, 2003 | Jan 24, 2003 | 12,200 |
| 32087-99 | Recompletion | Shell Oil Company | Sep 6, 1978 | Sep 6, 1978 | — | 11,497 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-79129 | — | — | — | — |
| — | — G-3-195636 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,002 | 8,022 | Perforated |
| 8,606 | 8,616 | Perforated |
| 9,056 | 9,064 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 3,006 | 15 | 500 S |
| 10.75 | 3,009 | 15 | 500 S |
| 5.5 | 11,027 | 9.875 | 475 S |
| 5.5 | 11,027 | 6.75 | 551 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 4, 2003 | Mar 5, 2003 | Yes |
| 00 | Jul 28, 2003 | — | — |
| 00 | Jan 12, 1984 | Sep 3, 1982 | Yes |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-00554 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-00554 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08900554, documented in the API reference.