TEXAS · WELLS · COLORADO COUNTY · API 42-089-30886 · DISTRICT 03

Strunk #1

Plugged

Colorado County · Nance (Tex-Miss # 3) field  · Vertical

Strunk #1 (API 42-089-30886) is a plugged well in Colorado County, plugged April 5, 1979, last operated by Gen. Amer. Oil CO. Of Texas.

The RRC has issued one drilling permit, issued January 13, 1978, permitted to 9,012 ft.

It was permitted by Texas Oil & Gas Corp. and has since transferred to Gen. Amer. Oil CO. Of Texas on the wellbore schedule.

Operator of record

Gen. Amer. Oil Co. of Texas

Permitted by Texas Oil & Gas Corp.; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Inactive (I)
P-5 last filed
Apr 12, 1982
Permits on file
94
Phone
(214) 368-5811

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexas Oil & Gas Corp.
Production reportsnone
Latest permitTexas Oil & Gas Corp.Jan 13, 1978
9,012
total depth, ft
1
permits on file
Jan 13, 1978
last permit issued
Apr 1, 1963
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 1, 1963
Shut in
—
Plugged
Apr 5, 1979

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
5486-99DrillTexas Oil & Gas Corp.Jan 13, 1978Jan 13, 1978Oct 18, 19779,012

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 1, 1963— G-3-7461Nance (Tex-Miss # 3)Gen. Amer. Oil Co. of TexasPlugged—
—Strunk G-3-74614Sublime N. (Wilcox 8870)Texas Oil & Gas Corp.Plugged—

Perforations

Perforated and open-hole intervals.

FromToType
8,8788,881Perforated
9,6369,644Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,52812.25545 S
2.8759,005—200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jan 11, 1978—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08930886, documented in the API reference.