TEXAS · WELLS · COLORADO COUNTY · MCDERMOTT, C. W. 5 LEASE · API 42-089-30934 · DISTRICT 03
McDermott C. W. 5 #5
Colorado County · Nada (2300) field · Vertical
Mcdermott C. W. 5 #5 (API 42-089-30934) is a plugged well in Colorado County, plugged January 24, 1994, last operated by Mitchell Energy Corporation.
The RRC has issued 3 drilling permits between 1978 and 1980, permitted to 7,100 ft.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jul 18, 2000
- Permits on file
- 4,224
- Phone
- (713) 377-5818
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mitchell Energy Corporation |
| Production reports | Mitchell Energy Corporationthrough Jul 1993 |
| Latest permit | Mitchell Energy CorporationSep 29, 1980 |
- 7,100
- total depth, ft
- 3
- permits on file
- Sep 29, 1980
- last permit issued
- Sep 26, 1980
- completed
- 0
- cumulative oil, bbl
- 3.33K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 1994
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 26, 1980
- Shut in
- —
- Plugged
- Jan 24, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McDermott, C. W. 5 G-3-92142 | Nada (2300) | Mitchell Energy Corporation | 1 | 0 | 3.33K | Jan 1993 – Jan 1994 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mitchell Energy CorporationJan 1993 → Jul 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 94023-99 | Recompletion | Mitchell Energy Corporation | Sep 29, 1980 | Sep 29, 1980 | — | 7,000 |
| 56618-99 | Recompletion | Mitchell Energy Corporation | Aug 28, 1979 | Aug 28, 1979 | — | 7,100 |
| 17869-99 | Drill | Mitchell Energy Corporation | Feb 8, 1978 | Feb 8, 1978 | — | 7,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 26, 1980 | McDermott C. W. 5 G-3-92142 | Nada (2300) | Mitchell Energy Corporation | Plugged | — |
| Nov 9, 1979 | McDermott C.W. #5 G-3-86108 | Nada (Catahoula C-2) | Mitchell Energy Corporation | Plugged | — |
| Apr 8, 1978 | McDermott C. W. G-3-77228 | Nada (Frio 3600) | Mitchell Energy Corporation | Plugged | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,266 | 2,276 | Perforated |
| 2,445 | 2,465 | Perforated |
| 3,608 | 3,610 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,980 | 13.75 | 1,080 S |
| 2.375 | 2,143 | — | — |
| 2.375 | 2,356 | — | — |
| 2.375 | 3,178 | — | — |
| 5.5 | 7,010 | 8.75 | 490 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Oct 6, 1980 | — |
| 00 | Jan 12, 1984 | Dec 19, 1979 | — |
| 00 | Jan 12, 1984 | Jun 15, 1978 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-30934 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-30934 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08930934, documented in the API reference.