WELL · 42-089-31152 · DISTRICT 3
Cullen H. R. et AL #7
Colorado County · Columbus (Consolidated) field · Producing · Vertical
Cullen H. R. ET AL #7 (API 42-089-31152) is a permitted well in Colorado County filed by Quintana Pet. Corp.; no completion report is on file yet.
The RRC has issued 6 drilling permits between 1980 and 1999, permitted to 12,506 ft.
It was permitted by Quintana Pet. Corp. and has since transferred to Strand Energy L.C. on the wellbore schedule.
Completion filings report 11 formation tops, including Jackson, Yegua, Weches, Wilcox.
Operator of record
Permitted by Quintana Pet. Corp.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 30, 2026
- Permits on file
- 321
- Phone
- (713) 658-8096
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Strand Energy, L.C.through Apr 2026 |
| Latest permit | Quintana Pet. Corp.Jul 2, 1999 |
- 12,506
- total depth, ft
- 6
- permits on file
- Jul 2, 1999
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 1.75M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cullen, H. R. et AL G-3-209812 | Columbus (Consolidated) | Strand Energy, L.C. | 1 | 0 | 748K | Jun 2005 – Jul 2026 |
| Cullen, H. R. et AL O-3-23740 | Columbus (11-D) | Hilcorp Energy Company | 1 | 0 | 0 | Sep 1999 – Aug 2005 |
| Cullen, H. R. et AL G-3-133431 | Columbus (12-F) | Quintana Pet. Corp. | 1 | 0 | 1.01M | Jan 1993 – Feb 2000 |
| Cullen, H. R. et AL G-3-126822 | Columbus (12-E Wilcox) | Quintana Pet. Corp. | 1 | 0 | 0 | Jan 1993 – Sep 1999 |
Gas, mcf lease total
Last 12 months 48,454 · prior 12 33,563(+44%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Quintana Pet. Corp.Jan 1993 → Jul 1999
- 2Hilcorp Energy CompanyJun 2005 → Sep 2006
- 3Goldking Operating Company, Inc.Oct 2006 → May 2007
- 4Dune Operating CompanyJun 2007 → Jul 2015
- 5Gordy Oil CompanyAug 2015 → Aug 2016
- 6Strand Energy, L.C.Sep 2016 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 485198-99 | Recompletion | Quintana Pet. Corp. | Jun 14, 1999 | Jul 2, 1999 | Jul 22, 1999 | 11,328 |
| 389825-99 | Recompletion | Quintana Pet. Corp. | Jul 12, 1991 | Jul 15, 1991 | — | 11,328 |
| 367406-99 | Other | Quintana Pet. Corp. | Dec 8, 1989 | Dec 27, 1989 | — | 11,328 |
| 343658-99 | Recompletion | Quintana Pet. Corp. | Mar 9, 1988 | Mar 9, 1988 | — | 11,328 |
| 188195-99 | Recompletion | Quintana Pet. Corp. | Mar 11, 1983 | Mar 11, 1983 | — | 11,328 |
| 85005-99 | Drill | Quintana Pet. Corp. | Jun 25, 1980 | Jun 25, 1980 | Aug 26, 1980 | 13,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | Cullen H. R. et AL G-3-209812 | Columbus (Consolidated) | Strand Energy L.C. | Producing | 12,506 |
| Sep 8, 1999 | Cullen H. R. et AL O-3-23740 | Columbus (11-D) | Hilcorp Energy Company | Not on Schedule | — |
| Jan 24, 1990 | Cullen H. R. et AL G-3-133431 | Columbus (12-F) | Quintana Pet. Corp. | Not on Schedule | — |
| Mar 9, 1988 | Cullen H. R. et AL G-3-126822 | Columbus (12-E Wilcox) | Quintana Pet. Corp. | Not on Schedule | — |
| Jun 27, 1983 | Cullen H. R. et AL G-3-106558 | Columbus ( 5-H Wilcox) | Quintana Pet. Corp. | Not on Schedule | — |
| Apr 14, 1981 | Cullen H.R. G-3-93307 | Columbus (Midway 11800) | Quintana Pet. Corp. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 241 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,522 | 7,530 | Perforated |
| 9,323 | 9,328 | Perforated |
| 9,343 | 9,347 | Perforated |
| 9,352 | 9,358 | Perforated |
| 9,438 | 9,447 | Perforated |
| 9,458 | 9,464 | Perforated |
| 10,102 | 10,121 | Perforated |
| 10,178 | 10,202 | Perforated |
| 11,830 | 11,850 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,512 | 14.75 | 1,255 S |
| 10.75 | 2,515 | 14.75 | 1,255 S |
| 2.375 | 7,533 | — | — |
| 7 | 10,517 | 9.875 | 820 S |
| 7 | 10,569 | 9.875 | 820 S |
| 2.375 | 11,329 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 18, 2005 | Jul 13, 2005 | — |
| 00 | Aug 5, 2005 | — | — |
| 00 | Dec 23, 1999 | Nov 30, 1999 | — |
| 00 | Dec 9, 1999 | — | — |
| 00 | Apr 19, 1990 | Mar 13, 1990 | Yes |
| 00 | Mar 27, 1990 | — | — |
| 00 | Apr 19, 1988 | Mar 25, 1988 | Yes |
| 00 | Apr 9, 1988 | — | — |
| 00 | Jan 12, 1984 | Jul 28, 1983 | — |
| 00 | Jan 12, 1984 | May 11, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-31152 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-31152 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08931152, documented in the API reference.