TEXAS · WELLS · COLORADO COUNTY · PRIESMEYER "A" LEASE · API 42-089-31629 · DISTRICT 03
Priesmeyer A #2
Colorado County · Ramsey E. (Wilcox 10 700) field · Producing · Vertical
Priesmeyer A #2 (API 42-089-31629) is a well in Colorado County operated by Magnum Producing LP, completed March 24, 2006 and listed as producing on the RRC schedule, shut in November 1, 2012.
The RRC has issued 3 drilling permits between 1985 and 2005, permitted to 11,000 ft.
Completion filings report one formation top, including Wilcox.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Corpus Christ, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 26, 2026
- Permits on file
- 312
- Phone
- (361) 882-3858
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Magnum Producing LP |
| Production reports | Magnum Producing, LPthrough Oct 2012 |
| Latest permit | Magnum Producing, LPOct 19, 2005 |
- 11,000
- total depth, ft
- 3
- permits on file
- Oct 19, 2005
- last permit issued
- Mar 24, 2006
- completed
- 0
- cumulative oil, bbl
- 623K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2005 THROUGH Oct 2012
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 24, 2006
- Shut in
- Nov 1, 2012
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Priesmeyer "A" G-3-214235 | Ramsey, E. (Wilcox 10,700) | Magnum Producing, LP | 1 | 0 | 623K | Sep 2005 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Magnum Producing, LPSep 2005 → Oct 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 608173-99 | Reenter | Magnum Producing, LP | Oct 19, 2005 | Oct 19, 2005 | Aug 31, 2005 | 11,000 |
| 291077-99 | Drill | Global Natural Resources Corp. | Nov 1, 1985 | Nov 22, 1985 | — | 9,800 |
| 287596-99 | Drill | Global Natural Resources Corp. | Nov 7, 1985 | Oct 15, 1985 | — | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 24, 2006 | Priesmeyer A G-3-214235 | Ramsey E. (Wilcox 10 700) | Magnum Producing LP | Producing · shut in Nov 1, 2012 | 11,000 |
Formation tops
As filed on W-2/G-1. Subsea from 204 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| WilcoxTOP OF WILCOX | 8,330 | -8,126 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,702 | 10,710 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,525 | 14.75 | 1,255 S |
| 7.625 | 10,948 | 9.875 | 835 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 30, 2008 | Mar 31, 2008 | — |
| 00 | Jun 19, 2006 | Jan 30, 2006 | Yes |
| 00 | Feb 28, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-31629 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-31629 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08931629, documented in the API reference.