TEXAS · WELLS · COLORADO COUNTY · FRAPART-CARRUTH TRUST LEASE · API 42-089-31797 · DISTRICT 03
Frapart-Carruth Trust #1
Colorado County · Garwood West (9800) field · Vertical
Frapart-Carruth Trust #1 (API 42-089-31797) is a plugged well in Colorado County, plugged August 6, 1993, last operated by Cobra Oil & Gas Corporation.
The RRC has issued one drilling permit (amended once), issued June 6, 1990, permitted to 9,100 ft.
Completion filings report 4 formation tops, including Miocene (undifferentiated), Vicksburg, Y-1 Sand(Yegua), Wilcox.
Operator of record
- Based in
- Wichita Falls, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 18, 2026
- Permits on file
- 778
- Phone
- (940) 716-5100
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Cobra Oil & Gas Corporation |
| Production reports | Cobra Oil & Gas Corporationthrough Jun 1993 |
| Latest permit | Cobra Oil & Gas CorporationJun 6, 1990 |
- 9,100
- total depth, ft
- 2
- permits on file
- Jun 6, 1990
- last permit issued
- Nov 7, 1990
- completed
- 0
- cumulative oil, bbl
- 8.15K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 1993
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 7, 1990
- Shut in
- —
- Plugged
- Aug 6, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Frapart-Carruth Trust G-3-138188 | Garwood, West (9800) | Cobra Oil & Gas Corporation | 1 | 0 | 8.15K | Jan 1993 – Oct 1993 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cobra Oil & Gas CorporationJan 1993 → Jun 1993
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 374185-98 | Drill | Cobra Oil & Gas Corporation | May 9, 1991 | Jun 6, 1990 | — | 8,600 |
| 374185-99 | Drill | Cobra Oil & Gas Corporation | Jun 6, 1990 | Jun 6, 1990 | Aug 25, 1990 | 9,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 7, 1990 | Frapart-Carruth Trust G-3-138188 | Garwood West (9800) | Cobra Oil & Gas Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 185 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)BASE MIOCENE | 2,538 | -2,353 |
| Vicksburg | 4,011 | -3,826 |
| Y-1 Sand(yegua) | 5,453 | -5,268 |
| Wilcox | 8,467 | -8,282 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,496 | 8,503 | Perforated |
| 8,591 | 8,593 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,624 | 11 | 475 S |
| 4.5 | 8,900 | 7.875 | 1,130 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 11, 1991 | Dec 3, 1990 | Yes |
| 00 | Jun 3, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-31797 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-31797 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08931797, documented in the API reference.