WELL · 42-089-31801 · DISTRICT 3
Columbus Field Unit #1604
Colorado County · Columbus (Consolidated) field · Temp Abandoned · Vertical
Columbus Field Unit #1604 (API 42-089-31801) is a well in Colorado County operated by Rusk Energy Operating LLC, completed March 31, 2003 and listed as temp abandoned on the RRC schedule, shut in October 1, 2003.
The RRC has issued 7 drilling permits (amended 3 times) between 1990 and 2000, permitted to 10,814 ft.
It was permitted by Mitchell Energy Corporation and has since transferred to Rusk Energy Operating LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Wilcox, Columbus (7-C), Columbus 7-C(0), Columbus (7-Cu).
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Mitchell Energy Corporation; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Feb 12, 2026
- Permits on file
- 16
- Phone
- (713) 252-6566
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Devon Energy Production Co, L.P.through Jan 2005 |
| Latest permit | Mitchell Energy CorporationApr 28, 2000 |
- 10,814
- total depth, ft
- 10
- permits on file
- Apr 28, 2000
- last permit issued
- Mar 31, 2003
- completed
- 0
- cumulative oil, bbl
- 22.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 31, 2003
- Shut in
- Oct 1, 2003
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 5 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Columbus Field Unit G-3-178846 | Columbus (Consolidated) | Rusk Energy Operating LLC | 1 | 0 | 22.1K | May 2000 – Jul 2026 |
| Columbus Field Unit G-3-148304 | Columbus (11-D & 11-F-S) | Mitchell Energy Corporation | 1 | 0 | 0 | Jan 1993 – May 2000 |
| — G-3-136016 | — | — | 0 | 0 | 0 | — |
| — G-3-142340 | — | — | 0 | 0 | 0 | — |
| — O-3-21362 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mitchell Energy CorporationMay 2000 → Aug 2000
- 2Devon Energy Operating Co., L.P.Apr 2003 → Sep 2003
- 3Devon Energy Production Co, L.P.Jan 2005 → Jan 2005
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 494556-99 | Recompletion | Mitchell Energy Corporation | Apr 28, 2000 | Apr 28, 2000 | Apr 28, 2000 | 10,708 |
| 437620-99 | Recompletion | OXY USA Inc. | Jul 7, 1995 | Jul 10, 1995 | — | 10,708 |
| 421303-99 | Recompletion | OXY USA Inc. | Feb 22, 1994 | Feb 28, 1994 | Aug 17, 1993 | 10,708 |
| 404295-99 | Recompletion | OXY USA Inc. | Oct 6, 1992 | Oct 6, 1992 | Oct 27, 1992 | 10,800 |
| 401175-98 | Recompletion | OXY USA Inc. | Sep 16, 1992 | Jul 13, 1992 | Jul 28, 1992 | 7,700 |
| 401175-99 | Recompletion | OXY USA Inc. | Jul 13, 1992 | Jul 13, 1992 | — | 7,700 |
| 395344-99 | Recompletion | OXY USA Inc. | Dec 23, 1991 | Dec 23, 1991 | Jan 4, 1992 | 7,700 |
| 375124-97 | Drill | OXY USA Inc. | Oct 9, 1990 | Jul 2, 1990 | — | 10,800 |
| 375124-98 | Drill | OXY USA Inc. | Aug 27, 1990 | Jul 2, 1990 | — | 11,500 |
| 375124-99 | Drill | OXY USA Inc. | Jul 2, 1990 | Jul 2, 1990 | Aug 8, 1990 | 10,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 31, 2003 | Columbus Field Unit G-3-178846 | Columbus (Consolidated) | Rusk Energy Operating LLC | Temp Abandoned · shut in Oct 1, 2003 | 10,814 |
| Nov 12, 1993 | Columbus Field Unit G-3-148304 | Columbus (11-D & 11-F-S) | Mitchell Energy Corporation | Not on Schedule | — |
| Nov 12, 1992 | Cfu G-3-142340 | Columbus (7000 Wilcox) | OXY USA Inc. | Not on Schedule | — |
| Nov 12, 1992 | Cfu G-3-142340 | Columbus (7000 Wilcox) | OXY USA Inc. | Not on Schedule | — |
| Jan 10, 1992 | Cfu O-3-21362 | Columbus ( 6-a Wilcox) | OXY USA Inc. | Not on Schedule | — |
| Sep 17, 1990 | Columbus Field Unit G-3-136016 | Columbus ( 6-E) | OXY USA Inc. | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 208 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,006 | 7,009 | Perforated |
| 7,573 | 7,575 | Perforated |
| 7,829 | 7,833 | Perforated |
| 8,722 | 8,732 | Perforated |
| 9,575 | 9,585 | Perforated |
| 9,867 | 9,880 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,752 | 12.25 | 965 S |
| 9.625 | 2,752 | 12.75 | 965 S |
| 5.5 | 10,800 | 8.75 | 2,400 S |
| 5.5 | 10,814 | 8.5 | 2,460 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 16, 2003 | Apr 30, 2003 | — |
| 00 | Nov 6, 2000 | Sep 6, 2000 | Yes |
| 00 | Oct 11, 2000 | — | — |
| 00 | Apr 22, 1994 | Feb 18, 1994 | — |
| 00 | Mar 9, 1994 | — | — |
| 00 | Jan 21, 1993 | Dec 7, 1992 | Yes |
| 00 | Oct 15, 1992 | Aug 14, 1992 | Yes |
| 00 | Oct 2, 1992 | — | — |
| 00 | Mar 6, 1992 | Jan 24, 1992 | Yes |
| 00 | Feb 21, 1992 | — | — |
| 00 | Dec 4, 1990 | Oct 12, 1990 | Yes |
| 00 | Nov 19, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-31801 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-31801 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08931801, documented in the API reference.