TEXAS · WELLS · COLORADO COUNTY · API 42-089-31897 · DISTRICT 03

Hlavinka #1

Plugged

Colorado County · Wildcat field  · Vertical

Hlavinka #1 (API 42-089-31897) is a plugged well in Colorado County, plugged July 27, 2001, last operated by Wagner Oil Company.

The RRC has issued 4 drilling permits (amended twice) between 1994 and 2000, permitted to 11,400 ft.

Completion filings report 4 formation tops, including Frio, Yegua, T Yegua, Wilcox.

Operator of record

Wagner Oil Company

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Dec 23, 2025
Permits on file
278
Phone
(817) 335-2222

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner Oil Company
Production reportsCody Energy LLCthrough Mar 1999
Latest permitWagner Oil CompanyJan 14, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,400
total depth, ft
6
permits on file
Jan 14, 2000
last permit issued
Jul 22, 1999
completed
0
cumulative oil, bbl
179K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1994 THROUGH Sep 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 22, 1999
Shut in
—
Plugged
Jul 27, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hlavinka G-3-174629WildcatWagner Oil Company100Jul 1999 – Sep 2001
Hlavinka G-3-154000Englehart (6300)Wagner Oil Company10161KJan 1995 – Jul 1999
Hlavinka G-3-151062Englehart (Wilcox 9100)Enron Oil & Gas Company1017.8KJul 1994 – Jun 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyOct 1994 → Feb 1998
  2. 2Cody Energy, Inc.Mar 1998 → Jan 1999
  3. 3Cody Energy LLCFeb 1999 → Mar 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
489864-99RecompletionWagner Oil CompanyNov 29, 1999Jan 14, 2000—6,210
486104-99RecompletionWagner Oil CompanyJul 23, 1999Jul 26, 1999Jul 19, 19996,500
431534-98RecompletionEnron Oil & Gas CompanyJan 4, 1995Jan 3, 1995Jan 18, 19959,000
431534-99RecompletionEnron Oil & Gas CompanyJan 3, 1995Jan 3, 1995—9,000
422705-98DrillEnron Oil & Gas CompanySep 20, 1994Apr 5, 1994Apr 26, 199411,400
422705-99DrillEnron Oil & Gas CompanyApr 5, 1994Apr 5, 1994—11,400

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 22, 1999Hlavinka G-3-174629WildcatWagner Oil CompanyPlugged—
Jan 19, 1995Hlavinka G-3-154000Englehart (6300)Wagner Oil CompanyPlugged—
Jul 1, 1994Hlavinka G-3-151062Englehart (Wilcox 9100)Enron Oil & Gas CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 168 ft elevation.Download CSV →

FormationMD ftSubsea
FrioBASE FRIO4,650-4,482
YeguaTOP YEGUA5,786-5,618
T Yegua5,786-5,618
WilcoxTOP WILCOX9,015-8,847

Perforations

Perforated and open-hole intervals.

FromToType
5,9145,930Perforated
6,5046,510Perforated
6,5516,560Perforated
9,0409,046Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,01012.251,010 S
9.6253,010—1,010 S
4.510,4008.751,640 S
4.510,400—1,640 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 9, 1999Oct 12, 1999Yes
00Nov 3, 1999——
00May 23, 1995Feb 6, 1995Yes
00May 17, 1995——
00Mar 20, 1995Oct 24, 1994—
00Oct 10, 1994Sep 22, 1994Yes
00Oct 3, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/08931897, documented in the API reference.