TEXAS · WELLS · COLORADO COUNTY · SCOTT LEASE · API 42-089-31932 · DISTRICT 03
Scott #1
Colorado County · Sublime N. (Wilcox 8900) field · Vertical
Scott #1 (API 42-089-31932) is a plugged well in Colorado County, plugged February 16, 2005, last operated by Dynamic Production Inc..
The RRC has issued one drilling permit (amended once), issued March 6, 1995, permitted to 10,000 ft.
Completion filings report one formation top, including T/Wilcox.
Its lease has reported 31.8K barrels of oil and 1.2M mcf of gas since May 1995, with no volume in the three years through April 2026.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 11, 2026
- Permits on file
- 276
- Phone
- (817) 838-1800
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dynamic Production Inc. |
| Production reports | Dynamic Production, Inc.through Jul 2003 |
| Latest permit | Dynamic Production, Inc.Mar 6, 1995 |
- 10,000
- total depth, ft
- 2
- permits on file
- Mar 6, 1995
- last permit issued
- May 28, 1995
- completed
- 31.8K
- cumulative oil, bbl
- 1.2M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 1995 THROUGH Jul 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 28, 1995
- Shut in
- —
- Plugged
- Feb 16, 2005
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Scott G-3-155102 | Sublime, N. (Wilcox 8900) | Dynamic Production, Inc. | 1 | 31.8K | 1.2M | May 1995 – Jul 2003 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dynamic Production, Inc.May 1995 → Jul 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 433563-98 | Drill | Dynamic Production, Inc. | Aug 15, 1995 | Mar 6, 1995 | Apr 19, 1995 | 8,970 |
| 433563-99 | Drill | Dynamic Production, Inc. | Mar 6, 1995 | Mar 6, 1995 | — | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 28, 1995 | Scott G-3-155102 | Sublime N. (Wilcox 8900) | Dynamic Production Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 313 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Wilcox | 6,735 | -6,422 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,864 | 8,874 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,509 | 12.25 | 490 S |
| 4.5 | 9,900 | 7.875 | 535 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 7, 1995 | Jul 7, 1995 | Yes |
| 00 | Aug 28, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-31932 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-31932 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08931932, documented in the API reference.