WELL · 42-089-32158 · DISTRICT 3
Lehrer A #3
Colorado County · Easter S. (6380) field · Vertical
Lehrer A #3 (API 42-089-32158) is a plugged well in Colorado County, plugged October 16, 2001, last operated by Walter Oil & Gas Corporation.
The RRC has issued 2 drilling permits between 1999 and 2000, permitted to 13,500 ft.
Completion filings report 4 formation tops, including Frio, Yegua, Toy Yegua, Wilcox.
Its 2 leases have reported 20K barrels of oil and 197K mcf of gas since September 1999, last reporting in November 2001. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 28, 2025
- Permits on file
- 193
- Phone
- (713) 659-1221
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Walter Oil & Gas Corporation |
| Production reports | Walter Oil & Gas Corporationthrough Mar 2001 |
| Latest permit | Walter Oil & Gas CorporationNov 1, 2000 |
- 13,500
- total depth, ft
- 2
- permits on file
- Nov 1, 2000
- last permit issued
- Nov 30, 2000
- completed
- 20K
- cumulative oil, bbl
- 197K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1999 THROUGH Nov 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 30, 2000
- Shut in
- —
- Plugged
- Oct 16, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lehrer "A" O-3-23757 | Easter, S. (Wilcox 10,400) | Walter Oil & Gas Corporation | 1 | 20K | 159K | Sep 1999 – Nov 2001 |
| Lehrer "A" G-3-184585 | Easter, S. (6380) | Walter Oil & Gas Corporation | 1 | 0 | 37.6K | Nov 2000 – Oct 2001 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Walter Oil & Gas CorporationSep 1999 → Mar 2001
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 501495-99 | Recompletion | Walter Oil & Gas Corporation | Nov 1, 2000 | Nov 1, 2000 | Nov 1, 2000 | 10,586 |
| 485884-99 | Drill | Walter Oil & Gas Corporation | Jul 15, 1999 | Jul 15, 1999 | Jul 19, 1999 | 13,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-184585 | — | — | — | — |
| — | — O-3-23757 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 192 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,465 | 6,479 | Perforated |
| 10,429 | 10,458 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,944 | 12.25 | 1,380 S |
| 4.5 | 10,588 | 8.75 | 1,409 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 17, 2001 | Aug 23, 2001 | Yes |
| 00 | Sep 27, 2001 | — | — |
| 00 | Feb 10, 2000 | Oct 4, 1999 | Yes |
| 00 | Jan 21, 2000 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-32158 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-32158 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08932158, documented in the API reference.