WELL · 42-089-32335 · DISTRICT 3
Lehrer #1
Colorado County · Easter (15120) field · Vertical
Lehrer #1 (API 42-089-32335) is a plugged well in Colorado County, plugged March 7, 2018, last operated by Tri-C Resources LLC.
The RRC has issued one drilling permit (amended once), issued January 23, 2003, permitted to 16,000 ft.
It was permitted by Tri-C Resources, Inc. and has since transferred to Tri-C Resources LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Yegua, Wilcox.
Operator of record
Permitted by Tri-C Resources, Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 30, 2026
- Permits on file
- 45
- Phone
- (713) 685-3600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Tri-C Resources LLC |
| Production reports | Tri-C Resources, LLCthrough Jul 2017 |
| Latest permit | Tri-C Resources, Inc.Jan 23, 2003 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 16,000
- total depth, ft
- 2
- permits on file
- Jan 23, 2003
- last permit issued
- Jul 10, 2003
- completed
- 0
- cumulative oil, bbl
- 2.61M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2003 THROUGH Mar 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 10, 2003
- Shut in
- —
- Plugged
- Mar 7, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Lehrer G-3-194900 | Easter (15120) | Tri-C Resources, LLC | 1 | 0 | 2.61M | May 2003 – Mar 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Tri-C Resources, Inc.May 2003 → Jun 2009
- 2Tri-C Resources, LLCJul 2009 → Jul 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 527635-98 | Drill | Tri-C Resources, Inc. | Mar 13, 2003 | Jan 23, 2003 | — | 16,000 |
| 527635-99 | Drill | Tri-C Resources, Inc. | Jan 23, 2003 | Jan 23, 2003 | Feb 1, 2003 | 15,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-194900 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 169 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 14,301 | 14,311 | Perforated |
| 14,382 | 14,388 | Perforated |
| 15,146 | 15,165 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 3,500 | 17.5 | 2,770 S |
| 9.625 | 11,194 | 12.25 | 710 S |
| 5.5 | 15,407 | 6.5 | 340 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 5, 2003 | Aug 5, 2003 | — |
| 00 | Sep 3, 2003 | Jun 23, 2003 | — |
| 00 | Jun 18, 2003 | May 16, 2003 | Yes |
| 00 | Jun 12, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-089-32335 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-089-32335 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/08932335, documented in the API reference.