WELL · 42-095-30638 · DISTRICT 7

G. Whitehead #7

N

Concho County · Branch S. (Ranger) field  · Vertical

G. Whitehead #7 (API 42-095-30638) is a well in Concho County operated by Husky Oil Company, completed January 20, 1983.

The RRC has issued 4 drilling permits between 1982 and 1996, permitted to 3,896 ft.

It was permitted by Quintx Exploration, Inc. and has since transferred to Husky Oil Company on the wellbore schedule.

Completion filings report 5 formation tops, including Bunger, Canyon, Vaughn, Crosscut.

No lease production has been reported under this well’s leases.

Operator of record

Husky Oil Company

Permitted by Quintx Exploration, Inc.; the EWA schedule now lists a different operator.

Cody, WY · P-5 Y, filed Apr 16, 1986 · 26 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHusky Oil Company
Production reportsQuintx Exploration, Inc.through Nov 1995
Latest permitQuintx Exploration, Inc.Mar 15, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,896
total depth, ft
4
permits on file
Mar 15, 1996
last permit issued
Jan 20, 1983
completed
0
cumulative oil, bbl
23.6K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 20, 1983
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Whitehead, G. G-9-157421Branch, S. (Crosscut)Willowbend Investments, Inc.100Feb 1996 – Jul 2026
Whitehead, G. G-9-129266Branch, S. (Palo Pinto)Quintx Exploration, Inc.1023.6KJan 1993 – Feb 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quintx Exploration, Inc.Jan 1993 → Nov 1995

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
445603-99RecompletionQuintx Exploration, Inc.Mar 12, 1996Mar 15, 1996Jan 29, 19962,516
353790-99RecompletionMarathon Oil CompanyDec 1, 1988Dec 1, 1988—3,896
201675-99RecompletionHusky Oil CompanyJul 15, 1983Jul 15, 1983—3,896
178632-99DrillHusky Oil CompanyNov 30, 1982Nov 30, 1982Dec 31, 19823,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-129266————
—— G-9-157421————

Formation tops

As filed on W-2/G-1. Subsea from 2,112 ft elevation.Download CSV →

FormationMD ftSubsea
Bunger1,600512
Canyon1,710402
Vaughn2,250-138
Crosscut2,360-248
Capps2,450-338

Perforations

Perforated and open-hole intervals.

FromToType
1,8491,856Perforated
2,1422,149Perforated
2,1552,158Perforated
2,2922,306Perforated
2,3562,362Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62533912.25240 S
2.3751,913——
22,332——
72,5148.25350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 23, 1996Mar 8, 1996Yes
00Mar 28, 1996——
00Jan 11, 1989Dec 23, 1988—
00Jan 2, 1989——
00Jan 12, 1984Sep 22, 1983—
00Jan 12, 1984Mar 24, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09530638, documented in the API reference.