TEXAS · WELLS · CONCHO COUNTY · API 42-095-30724 · DISTRICT 6E
Houston Ella (A) #3
Concho County · Paint Rock W. (Goen D) field · Vertical
Houston Ella (A) #3 (API 42-095-30724) is a plugged well in Concho County, plugged August 15, 1986, last operated by Circle Ridge Production Inc..
The RRC has issued one drilling permit, issued April 24, 1984, permitted to 3,500 ft.
It was permitted by El Paso Oil Investment Inc. and has since transferred to Circle Ridge Production Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including Upper Caps, Goen.
Operator of record
Permitted by El Paso Oil Investment Inc.; the EWA schedule now lists a different operator.
- Based in
- Graham, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- May 29, 2025
- Permits on file
- 17
- Phone
- (940) 521-9150
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Circle Ridge Production Inc. |
| Production reports | none |
| Latest permit | El Paso Oil Investment Inc.Apr 24, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,500
- total depth, ft
- 1
- permits on file
- Apr 24, 1984
- last permit issued
- Jun 18, 1984
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 18, 1984
- Shut in
- —
- Plugged
- Aug 15, 1986
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 236501-99 | Drill | El Paso Oil Investment Inc. | Apr 16, 1984 | Apr 24, 1984 | — | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 18, 1984 | Houston Ella 1 O-9-10452 | Paint Rock W. (Goen D) | Concho Oilfield Serv & Oper Co. | Plugged | — |
| Jun 18, 1984 | Houston Ella (A) O-9-11573 | Paint Rock W. (Goen D) | Circle Ridge Production Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,679 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Upper Caps | 2,950 | -1,271 |
| Goen | 3,300 | -1,621 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,308 | 3,318 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 111 | 11 | 60 sx |
| 4.5 | 3,505 | 7.875 | 175 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 16, 1985 | Jul 23, 1984 | — |
| 00 | Oct 8, 1985 | — | — |
| 00 | Aug 1, 1984 | Jul 23, 1984 | — |
| 00 | Jul 31, 1984 | Jul 23, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-095-30724 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-095-30724 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- May 1987
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000055907 | H-1 Injection | Plugged Sep 15, 1986 | 0 | 0 | 3,360–0 |
MONTHLY INJECTED, BBL · H-10 · LAST 9 REPORTED MONTHS
Last 12 months 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09530724, documented in the API reference.