WELL · 42-095-30846 · DISTRICT 7
Paint Rock #1
Concho County · Speck North (Canyon) field · Vertical
Paint Rock #1 (API 42-095-30846) is a plugged well in Concho County, plugged August 8, 2001, last operated by Wbr Inc..
The RRC has issued 3 drilling permits between 1985 and 1991, permitted to 4,000 ft.
Completion filings report 5 formation tops, including Cook Sand, King Sand, Canyon, Capps.
Its 2 leases have reported 2.15K barrels of oil and 19 mcf of gas since January 1993, last reporting in September 2001.
Operator of record
Dallas, TX · P-5 Y, filed Jun 7, 1996 · 12 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | WBR Inc. |
| Production reports | 3-D Oil & Gasthrough Aug 1997 |
| Latest permit | WBR, Inc.Aug 26, 1991 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,000
- total depth, ft
- 3
- permits on file
- Aug 26, 1991
- last permit issued
- May 16, 1988
- completed
- 2.15K
- cumulative oil, bbl
- 19
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2001
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 16, 1988
- Shut in
- —
- Plugged
- Aug 8, 2001
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Paint Rock O-9-13137 | Paint Rock (Caps, Lower) | 3-D Oil & Gas | 1 | 2.15K | 19 | Jan 1993 – Sep 2001 |
| — G-9-128451 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1WBR, Inc.Jan 1993 → Nov 1994
- 23-D Oil & GasDec 1994 → Aug 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 391259-99 | Recompletion | WBR, Inc. | Aug 26, 1991 | Aug 26, 1991 | Aug 28, 1991 | 3,650 |
| 349494-99 | Recompletion | Danick Exploration Corporation | Jul 28, 1988 | Sep 8, 1988 | — | 3,650 |
| 290199-99 | Drill | Danick Exploration Corporation | Nov 15, 1985 | Nov 15, 1985 | — | 4,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-128451 | — | — | — | — |
| — | — O-9-13137 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,855 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,100 | 3,108 | Perforated |
| 3,408 | 3,415 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 125 | 12.25 | 90 S |
| 4.5 | 3,640 | 7.875 | 215 S |
| 4.5 | 3,650 | 7.875 | 215 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 8, 1991 | Sep 17, 1991 | Yes |
| 00 | Sep 30, 1991 | — | — |
| 00 | Nov 14, 1988 | Aug 29, 1988 | Yes |
| 00 | Oct 5, 1988 | — | — |
| 00 | Jul 29, 1986 | Jul 21, 1986 | — |
| 00 | Jul 26, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-095-30846 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-095-30846 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09530846, documented in the API reference.