WELL · 42-095-30846 · DISTRICT 7

Paint Rock #1

Plugged

Concho County · Speck North (Canyon) field  · Vertical

Paint Rock #1 (API 42-095-30846) is a plugged well in Concho County, plugged August 8, 2001, last operated by Wbr Inc..

The RRC has issued 3 drilling permits between 1985 and 1991, permitted to 4,000 ft.

Completion filings report 5 formation tops, including Cook Sand, King Sand, Canyon, Capps.

Its 2 leases have reported 2.15K barrels of oil and 19 mcf of gas since January 1993, last reporting in September 2001.

Operator of record

WBR Inc.

Dallas, TX · P-5 Y, filed Jun 7, 1996 · 12 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWBR Inc.
Production reports3-D Oil & Gasthrough Aug 1997
Latest permitWBR, Inc.Aug 26, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
3
permits on file
Aug 26, 1991
last permit issued
May 16, 1988
completed
2.15K
cumulative oil, bbl
19
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 16, 1988
Shut in
—
Plugged
Aug 8, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Paint Rock O-9-13137Paint Rock (Caps, Lower)3-D Oil & Gas12.15K19Jan 1993 – Sep 2001
— G-9-128451——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1WBR, Inc.Jan 1993 → Nov 1994
  2. 23-D Oil & GasDec 1994 → Aug 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
391259-99RecompletionWBR, Inc.Aug 26, 1991Aug 26, 1991Aug 28, 19913,650
349494-99RecompletionDanick Exploration CorporationJul 28, 1988Sep 8, 1988—3,650
290199-99DrillDanick Exploration CorporationNov 15, 1985Nov 15, 1985—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-128451————
—— O-9-13137————

Formation tops

As filed on W-2/G-1. Subsea from 1,855 ft elevation.Download CSV →

FormationMD ftSubsea
Cook Sand1,900-45
King Sand2,000-145
Canyon3,100-1,245
CanyonCANYON SAND3,100-1,245
Capps3,403-1,548
Goen Lime3,500-1,645

Perforations

Perforated and open-hole intervals.

FromToType
3,1003,108Perforated
3,4083,415Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512512.2590 S
4.53,6407.875215 S
4.53,6507.875215 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 8, 1991Sep 17, 1991Yes
00Sep 30, 1991——
00Nov 14, 1988Aug 29, 1988Yes
00Oct 5, 1988——
00Jul 29, 1986Jul 21, 1986—
00Jul 26, 1986——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09530846, documented in the API reference.