WELL · 42-095-31348 · DISTRICT 7

Rabon #5

Plugged

Concho County · Lonesome Dove II (King Sand) field  · Vertical

Rabon #5 (API 42-095-31348) is a plugged well in Concho County, plugged April 23, 2008, last operated by Marshall & Winston Inc..

The RRC has issued one drilling permit, issued July 11, 1991, permitted to 2,600 ft.

Completion filings report 4 formation tops, including Cook Sand, Base Breckenridge, King Lime, King Sand.

Its lease has reported 172K barrels of oil and 50.8K mcf of gas since January 1993, last reporting in February 2019. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

Marshall & Winston Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
May 14, 2026
Permits on file
359
Phone
(432) 684-6373

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMarshall & Winston Inc.
Production reportsMarshall & Winston, Inc.through Nov 2018
Latest permitMarshall & Winston, Inc.Jul 11, 1991
2,600
total depth, ft
1
permits on file
Jul 11, 1991
last permit issued
Jul 24, 1991
completed
172K
cumulative oil, bbl
50.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 24, 1991
Shut in
—
Plugged
Apr 23, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rabon O-9-12755Lonesome Dove II (King Sand)Marshall & Winston, Inc.6172K50.8KJan 1993 – Feb 2019

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Marshall & Winston, Inc.Jan 1993 → Nov 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
389819-99DrillMarshall & Winston, Inc.Jul 11, 1991Jul 11, 1991Jul 12, 19912,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-12755————

Formation tops

As filed on W-2/G-1. Subsea from 2,154 ft elevation.Download CSV →

FormationMD ftSubsea
Cook Sand1,756398
Base Breckenridge2,038116
King Lime2,08371
King Sand2,10450

Perforations

Perforated and open-hole intervals.

FromToType
2,1052,124Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62540811175 S
5.52,2287.875400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 29, 1991Aug 21, 1991Yes
00Aug 28, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.