WELL · 42-095-31800 · DISTRICT 7
Fritz #2125
Concho County · Vertical
Fritz #2125 (API 42-095-31800) is a plugged well in Concho County, plugged December 13, 1997, last operated by Pickens Company, Inc., The.
The RRC has issued 4 drilling permits between 1997 and 1999, permitted to 3,500 ft.
Completion filings report 8 formation tops, including Base Stockwether, Tannehill, Top Flippen Sand, Top Lower Kind Sand.
Its 2 leases have reported 153K barrels of oil and 1.47M mcf of gas since July 1997, last reporting in July 2026. The leases carry 13 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Dallas, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Aug 23, 2012
- Permits on file
- 178
- Phone
- (214) 369-7471
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Cazar Energy Incthrough Nov 2024 |
| Latest permit | Pickens Company, Inc., TheDec 9, 1999 |
- 3,500
- total depth, ft
- 4
- permits on file
- Dec 9, 1999
- last permit issued
- —
- completed
- 153K
- cumulative oil, bbl
- 1.47M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 1997 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Dec 13, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 13 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Fritz O-9-14606 | Millersview, W. (Camar Sd.) | Cazar Energy Inc | 5 | 65.5K | 171K | Jul 1997 – Jul 2026 |
| Fritz O-9-14776 | Millersview, W. (Cross Cut SD) | Cazar Energy Inc | 8 | 87.5K | 1.3M | Apr 1998 – Jul 2026 |
Oil, barrels lease total
Last 12 months 0 · prior 12 112(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Pickens Company, Inc., TheJul 1997 → Apr 2007
- 2Paint Rock Operating, LLCMay 2007 → Jan 2016
- 3Cazar Energy IncFeb 2016 → Nov 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 490014-99 | Recompletion | Pickens Company, Inc., The | Dec 3, 1999 | Dec 9, 1999 | Dec 3, 1999 | 3,500 |
| 486407-99 | Recompletion | Pickens Company, Inc., The | Aug 5, 1999 | Aug 6, 1999 | Sep 20, 1999 | 3,500 |
| 482494-99 | Reenter | Pickens Company, Inc., The | Feb 5, 1999 | Feb 8, 1999 | Feb 9, 1999 | 3,500 |
| 470172-99 | Drill | Pickens Company, Inc., The | Nov 17, 1997 | Nov 25, 1997 | Dec 5, 1997 | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-14606 | — | — | — | — |
| — | — O-9-14776 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,766 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Stockwether | 1,350 | 416 |
| TannehillTOP TANNEHILL SAND | 1,360 | 406 |
| Top Flippen Sand | 1,487 | 279 |
| Top Lower Kind Sand | 1,772 | -6 |
| Top Lower King Sand | 1,772 | -6 |
| Top Second Cross Cut Sand | 2,815 | -1,049 |
| Top Second Crosscut Sand | 2,815 | -1,049 |
| Top Camar Sand | 3,026 | -1,260 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,817 | 2,827 | Perforated |
| 3,072 | 3,080 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 116 | 12.25 | 75 S |
| 8.625 | 128 | 12.25 | 75 S |
| 4.5 | 3,221 | 6.75 | 210 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 15, 2000 | Jan 3, 2000 | — |
| 00 | Nov 22, 1999 | Oct 8, 1999 | Yes |
| 00 | Oct 28, 1999 | Apr 2, 1999 | Yes |
| 00 | Jun 3, 1999 | Apr 2, 1999 | Yes |
| 00 | Apr 26, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-095-31800 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-095-31800 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09531800, documented in the API reference.