TEXAS · WELLS · CONCHO COUNTY · FRITZ LEASE · API 42-095-31811 · DISTRICT 6E

Fritz #3125

Plugged

Concho County · Millersview W. (Cross Cut SD) field  · Vertical

Fritz #3125 (API 42-095-31811) is a plugged well in Concho County, plugged March 27, 2012, last operated by Cazar Energy Inc.

The RRC has issued one drilling permit, issued February 25, 1998, permitted to 3,600 ft.

It was permitted by Pickens Company, Inc., The and has since transferred to Cazar Energy Inc on the wellbore schedule.

Completion filings report 5 formation tops, including Stockwether, Palo Pinto, Cross Cut, Camar.

Its lease has reported 87.5K barrels of oil and 1.3M mcf of gas since April 1998, last reporting volume in November 2024. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

Cazar Energy Inc

Permitted by Pickens Company, Inc., The; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 8, 2026
Permits on file
16
Phone
(512) 626-8750

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCazar Energy Inc
Production reportsCazar Energy Incthrough Nov 2024
Latest permitPickens Company, Inc., TheFeb 25, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,600
total depth, ft
1
permits on file
Feb 25, 1998
last permit issued
Apr 13, 1998
completed
87.5K
cumulative oil, bbl
1.3M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1998 THROUGH Nov 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 13, 1998
Shut in
—
Plugged
Mar 27, 2012

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fritz O-9-14776Millersview, W. (Cross Cut SD)Cazar Energy Inc887.5K1.3MApr 1998 – Nov 2024

Oil, barrels lease total

Last 12 months 0 · prior 12 80(-100%)

02040202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pickens Company, Inc., TheApr 1998 → Apr 2007
  2. 2Paint Rock Operating, LLCMay 2007 → Jan 2016
  3. 3Cazar Energy IncFeb 2016 → Nov 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
473441-99DrillPickens Company, Inc., TheFeb 17, 1998Feb 25, 1998Mar 5, 19983,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 13, 1998Fritz O-9-14776Millersview W. (Cross Cut SD)Cazar Energy IncPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,752 ft elevation.Download CSV →

FormationMD ftSubsea
Stockwether1,302450
Palo PintoBASE PALO PINTO2,637-885
Cross Cut2,782-1,030
Camar3,002-1,250
Goen3,127-1,375

Perforations

Perforated and open-hole intervals.

FromToType
2,7822,786Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251181175 S
4.52,9647.875285 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jul 1, 1998May 11, 1998Yes
00Jun 15, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09531811, documented in the API reference.