WELL · 42-095-31936 · DISTRICT 7
Maggie H #1
Concho County · Whitworth Ranch (L. Canyon C ) field · Vertical
Maggie H #1 (API 42-095-31936) is a plugged well in Concho County, plugged June 16, 2008, last operated by Leclair Operating CO. Inc..
The RRC has issued 2 drilling permits between 2001 and 2002, permitted to 3,000 ft.
Completion filings report 5 formation tops, including Base Breckenridge, Palo Pinto, Crosscut, Canyon.
Operator of record
Abilene, TX · P-5 Y, filed Apr 8, 2016 · 351 permits on file · (325) 668-2298
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Leclair Operating Co. Inc. |
| Production reports | Leclair Operating Co., Inc.through Jan 2003 |
| Latest permit | Leclair Operating Co., Inc.Mar 12, 2002 |
- 3,000
- total depth, ft
- 2
- permits on file
- Mar 12, 2002
- last permit issued
- Mar 1, 2001
- completed
- 0
- cumulative oil, bbl
- 25.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2001 THROUGH Jun 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 1, 2001
- Shut in
- —
- Plugged
- Jun 16, 2008
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Maggie "H" G-9-188185 | Whitworth Ranch (Crosscut) | Bowerman Exploration, Inc. | 1 | 0 | 2.39K | Feb 2002 – Jun 2008 |
| Maggie "H" G-9-183032 | Whitworth Ranch (L. Canyon "C") | Leclair Operating Co., Inc. | 1 | 0 | 22.8K | Mar 2001 – Feb 2002 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bowerman Energy CompanyMar 2001 → Jun 2001
- 2Leclair Operating Co., Inc.Aug 2002 → Jan 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 518179-99 | Recompletion | Leclair Operating Co., Inc. | Mar 8, 2002 | Mar 12, 2002 | Feb 7, 2002 | 2,080 |
| 503832-99 | Drill | Bowerman Energy Company | Jan 9, 2001 | Jan 9, 2001 | Jan 11, 2001 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-183032 | — | — | — | — |
| — | — G-9-188185 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,729 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Breckenridge | 1,046 | 683 |
| Palo Pinto | 1,776 | -47 |
| Crosscut | 1,874 | -145 |
| CanyonCANYON "C" SAND | 2,126 | -397 |
| L. Canyon "C" | 2,126 | -397 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,874 | 1,878 | Perforated |
| 2,126 | 2,133 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 130 | 11 | 50 S |
| 4.5 | 2,261 | 7.875 | 130 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 26, 2002 | Mar 1, 2002 | Yes |
| 00 | Apr 26, 2002 | — | — |
| 00 | Aug 16, 2001 | Apr 13, 2001 | Yes |
| 00 | Jul 9, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-095-31936 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-095-31936 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09531936, documented in the API reference.