WELL · 42-097-05206 · DISTRICT 9
Theobald Larkin J. #1
Cooke County · Woodbine field · Vertical
Theobald Larkin J. #1 (API 42-097-05206) is a plugged well in Cooke County, plugged August 22, 2013, last operated by Seitz J. R. & Adam Ltd..
The RRC has issued one drilling permit, issued November 25, 1986, permitted to 4,086 ft.
It was permitted by Seitz, J. R. & Adam and has since transferred to Seitz J. R. & Adam Ltd. on the wellbore schedule.
Its lease has reported 17.4K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Seitz, J. R. & Adam; the EWA schedule now lists a different operator.
- Based in
- Wichita Falls, TX
- P-5 status
- Active (A)
- P-5 last filed
- Sep 10, 2025
- Permits on file
- 78
- Phone
- (940) 723-7303
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Seitz J. R. & Adam Ltd. |
| Production reports | Seitz, J. R. & Adam, Ltd.through Nov 2022 |
| Latest permit | Seitz, J. R. & AdamNov 25, 1986 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,086
- total depth, ft
- 1
- permits on file
- Nov 25, 1986
- last permit issued
- Jun 20, 1978
- completed
- 17.4K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 20, 1978
- Shut in
- —
- Plugged
- Aug 22, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Theobald, Larkin J. O-13-26911 | Woodbine | Seitz, J. R. & Adam, Ltd. | 2 | 17.4K | 21 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Seitz, J. R. & AdamJan 1993 → Dec 1998
- 2Seitz, J. R. & Adam, Ltd.Jan 1999 → Nov 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 339290-99 | Recompletion | Seitz, J. R. & Adam | Nov 23, 1987 | Nov 25, 1986 | — | 4,086 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-26911 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,853 | 2,860 | Perforated |
| 4,021 | 4,028 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 66 | 10.5 | 40 S |
| 8.625 | 66 | — | — |
| 5.5 | 4,084 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 18, 1988 | Nov 17, 1987 | Yes |
| 00 | Jan 12, 1988 | — | — |
| 00 | Jan 12, 1984 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-097-05206 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-097-05206 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09705206, documented in the API reference.