TEXAS · WELLS · COOKE COUNTY · DANGLE LEASE · API 42-097-31307 · DISTRICT 7C

Dangle #4

Y

Cooke County · Dangle field · Producing  · Vertical

Dangle #4 (API 42-097-31307) is a well in Cooke County operated by Wfw Production Company Inc., completed July 27, 1988 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits in 1978, permitted to 2,248 ft.

It was permitted by Phillips Petroleum Company and has since transferred to Wfw Production Company Inc. on the wellbore schedule.

Completion filings report one formation top, including Ellenburger.

Its lease has reported 193K barrels of oil and 12 mcf of gas since January 1993, last reporting in July 2026. The lease carries 17 wells, so these are lease totals, not this well alone.

Operator of record

WFW Production Company Inc.

Permitted by Phillips Petroleum Company; the EWA schedule now lists a different operator.

Based in
Muenster, TX
P-5 status
Active (A)
P-5 last filed
Apr 30, 2026
Permits on file
265
Phone
(940) 759-4001

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWFW Production Company Inc.
Production reportsWFW Production Company, Inc.through Apr 2026
Latest permitPhillips Petroleum CompanyNov 13, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,248
total depth, ft
2
permits on file
Nov 13, 1978
last permit issued
Jul 27, 1988
completed
193K
cumulative oil, bbl
12
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 27, 1988
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 17 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Dangle O-13-2279DangleWFW Production Company, Inc.17193K12Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 8,316 · prior 12 8,406(-1%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Phillips Petroleum CompanyJan 1993 → Mar 1994
  2. 2WFW Production Company, Inc.Sep 1995 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
56137-99DrillPhillips Petroleum CompanyNov 13, 1978Nov 13, 1978—2,200
28754-99DrillPhillips Petroleum CompanyJul 19, 1978Jul 19, 1978—2,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 27, 1988Dangle O-13-2279DangleWFW Production Company Inc.Producing2,248

Formation tops

As filed on W-2/G-1. Subsea from 1,079 ft elevation.Download CSV →

FormationMD ftSubsea
EllenburgerELLENBERGER2,167-1,088

Perforations

Perforated and open-hole intervals.

FromToType
2,1702,190Perforated
2,1702,236Open hole
2,1702,248Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
2.3752,165——
5.52,1707.875620 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 7, 1988Aug 18, 1988—
00Feb 9, 1987Jan 12, 1987—
00Jan 12, 1984Apr 4, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09731307, documented in the API reference.