WELL · 42-097-31717 · DISTRICT 9
Bullard C. #2
Cooke County · Kimbell (Thurman Sand) field · Vertical
Bullard C. #2 (API 42-097-31717) is a plugged well in Cooke County, plugged October 1, 2014, last operated by Grayson Petroleum Company.
The RRC has issued one drilling permit, issued January 27, 1981, permitted to 3,300 ft.
Its lease has reported 22.7K barrels of oil and 21 mcf of gas since January 1993, last reporting in January 2021. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Whitesboro, TX
- P-5 status
- Active (A)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 124
- Phone
- (903) 564-6279
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Grayson Petroleum Company |
| Production reports | Grayson Petroleum Companythrough Jan 2016 |
| Latest permit | Grayson Petroleum CompanyJan 27, 1981 |
- 3,300
- total depth, ft
- 1
- permits on file
- Jan 27, 1981
- last permit issued
- Mar 10, 2001
- completed
- 22.7K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 10, 2001
- Shut in
- —
- Plugged
- Oct 1, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bullard, C. O-13-20803 | Kimbell (Thurman Sand) | Grayson Petroleum Company | 3 | 22.7K | 21 | Jan 1993 – Jan 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Grayson Petroleum CompanyJan 1993 → Jan 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 106576-99 | Drill | Grayson Petroleum Company | Jan 27, 1981 | Jan 27, 1981 | — | 3,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-13-20803 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,242 | 3,248 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 100 | 10.75 | 90 S |
| 4.5 | 3,280 | 7.875 | 700 S |
| 2.875 | 3,280 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 6, 2001 | Apr 10, 2001 | — |
| 00 | Jan 12, 1984 | Mar 10, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-097-31717 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-097-31717 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- Aug 2014
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000090212 | H-1 Injection | Plugged Oct 17, 2014 | 100 | 1,600 | 3,242–3,248 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/09731717, documented in the API reference.