WELL · 42-097-32460 · DISTRICT 9

Baugh Nolan #3

N

Cooke County · Sivells Bend field  · Vertical

Baugh Nolan #3 (API 42-097-32460) is a well in Cooke County operated by Chevron U. S. A. Inc., completed January 3, 1984.

The RRC has issued one drilling permit, issued November 7, 1983, permitted to 8,000 ft.

Completion filings report 4 formation tops, including Btm. Rocky Pt. Congl., T. Dillard Pay, Dillard, T. Pace.

Its lease has reported 1.96M barrels of oil and 64.5K mcf of gas since January 1993, last reporting in July 2026. The lease carries 29 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Chevron U. S. A. Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Jan 30, 2026
Permits on file
9,291
Phone
(866) 212-1212

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChevron U. S. A. Inc.
Production reportsSNR Operating, LLCthrough Mar 2026
Latest permitChevron U. S. A. Inc.Nov 7, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,000
total depth, ft
1
permits on file
Nov 7, 1983
last permit issued
Jan 3, 1984
completed
1.96M
cumulative oil, bbl
64.5K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 3, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 29 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Sivells Bend Unit O-13-27021Sivells BendSNR Operating, LLC291.96M64.5KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 4,987 · prior 12 11,329(-56%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Harper, WayneJan 1993 → Nov 2004
  2. 2Bend Petroleum Corp.Dec 2004 → May 2022
  3. 3SNR Northern Oklahoma Oprtg, LLCJun 2022 → Aug 2022
  4. 4SNR Operating, LLCSep 2022 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
220074-99DrillChevron U. S. A. Inc.Nov 7, 1983Nov 7, 1983Nov 20, 19838,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-13-27021————

Formation tops

As filed on W-2/G-1. Subsea from 820 ft elevation.Download CSV →

FormationMD ftSubsea
Btm. Rocky Pt. Congl.6,040-5,220
T. Dillard Pay7,530-6,710
Dillard7,532-6,712
T. Pace7,722-6,902

Perforations

Perforated and open-hole intervals.

FromToType
7,5327,548Perforated
7,5327,557Perforated
7,5537,557Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62581512.25752 S
5.57,8217.8751,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 19, 1993Jan 19, 1993—
00Jul 30, 1991Jul 22, 1991—
00May 18, 1988Jan 27, 1984—
00May 3, 1988——
00Feb 23, 1984Jan 27, 1984—
00Feb 2, 1984Jan 27, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
5.72M
bbl, all reported
Aug 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000078201H-1 InjectionActive7002,5007,532–7,557

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 119,085(-100%)

05K10K15K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/09732460, documented in the API reference.