TEXAS · WELLS · COTTLE COUNTY · WINDFOHR, A.B. 10 LEASE · API 42-101-30529 · DISTRICT 7B

Windfohr A.B. 10 #1

Y

Cottle County · Rhombochasm (Bend Conglomerate) field · Producing  · Vertical

Windfohr A.B. 10 #1 (API 42-101-30529) is a well in Cottle County operated by Petex, completed August 13, 1994 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 5, 1994, permitted to 8,562 ft.

It was permitted by Burnett Oil CO., Inc. and has since transferred to Petex on the wellbore schedule.

Completion filings report 6 formation tops, including Wichita-Albany, B/Coleman Junction, Breckenridge, Caddo.

Its lease has reported 17.2K barrels of oil and 2.66M mcf of gas since August 1994, last reporting volume in April 2026.

Operator of record

Petex

Permitted by Burnett Oil Co., Inc.; the EWA schedule now lists a different operator.

Based in
Breckenridge, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 24, 2026
Permits on file
124
Phone
(254) 559-5453

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetex
Production reportsPetexthrough Apr 2026
Latest permitBurnett Oil Co., Inc.Apr 5, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,562
total depth, ft
1
permits on file
Apr 5, 1994
last permit issued
Aug 13, 1994
completed
17.2K
cumulative oil, bbl
2.66M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1994 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 13, 1994
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Windfohr, A.B. 10 G-11-150782Rhombochasm (Bend Conglomerate)Petex117.2K2.66MAug 1994 – Apr 2026

Gas, mcf lease total

Last 12 months 23,880 · prior 12 21,041(+13%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Burnett Oil Co., Inc.Aug 1994 → Nov 2016
  2. 2PetexDec 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
422536-99DrillBurnett Oil Co., Inc.Mar 30, 1994Apr 5, 1994May 7, 19949,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 13, 1994Windfohr A.B. 10 G-11-150782Rhombochasm (Bend Conglomerate)PetexProducing8,562

Formation tops

As filed on W-2/G-1. Subsea from 1,617 ft elevation.Download CSV →

FormationMD ftSubsea
Wichita-AlbanyWICHITA ALBANY1,760-143
B/Coleman Junction2,700-1,083
Breckenridge3,887-2,270
CaddoCADDO LIME6,947-5,330
MorrowMORROW LIME7,552-5,935
Precambrian8,534-6,917

Perforations

Perforated and open-hole intervals.

FromToType
7,1907,200Perforated
7,2107,212Perforated
7,3347,342Perforated
7,4767,484Perforated
7,4967,510Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62534912.25300 S
5.58,0697.875550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 25, 1994Aug 22, 1994Yes
00Sep 8, 1994——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10130529, documented in the API reference.