TEXAS · WELLS · COTTLE COUNTY · RUSSELL LEASE · API 42-101-30640 · DISTRICT 7B

Russell #7

Y

Cottle County · Broken Bone (Congl.) field · Producing  · Vertical

Russell #7 (API 42-101-30640) is a well in Cottle County operated by Wagner Oil Company, completed February 4, 2006 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2005 and 2007, permitted to 10,820 ft.

It was permitted by Gunn Oil Company and has since transferred to Wagner Oil Company on the wellbore schedule.

Completion filings report 7 formation tops, including Wichita-Albany, Saddle Creek, Brechenridge, Breckenridge.

No lease production has been reported under this well’s leases.

Operator of record

Wagner Oil Company

Permitted by Gunn Oil Company; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Dec 23, 2025
Permits on file
278
Phone
(817) 335-2222

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner Oil Company
Production reportsWagner Oil Companythrough Apr 2026
Latest permitGunn Oil CompanyFeb 9, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,820
total depth, ft
2
permits on file
Feb 9, 2007
last permit issued
Feb 4, 2006
completed
0
cumulative oil, bbl
1.35M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 4, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Russell G-11-216195Rhombochasm (Bend Conglomerate)Wagner Oil Company101.35MFeb 2006 – Jul 2026

Gas, mcf lease total

Last 12 months 19,544 · prior 12 25,638(-24%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Gunn Oil CompanyFeb 2006 → Jan 2023
  2. 2Wagner Oil CompanyFeb 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
633045-99Field transferGunn Oil CompanyFeb 5, 2007Feb 9, 2007Sep 6, 200512,000
605437-99DrillGunn Oil CompanyAug 25, 2005Aug 25, 2005Sep 6, 200512,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 4, 2006Russell G-11-216195Broken Bone (Congl.)Wagner Oil CompanyProducing10,820
Feb 4, 2006Russell G-11-216195Broken Bone (Congl.)Wagner Oil CompanyProducing10,820

Formation tops

As filed on W-2/G-1. Subsea from 1,682 ft elevation.Download CSV →

FormationMD ftSubsea
Wichita-AlbanyWICHITA ALBANY2,142-460
Saddle Creek3,904-2,222
Brechenridge4,363-2,681
Breckenridge4,363-2,681
Gunsight4,991-3,309
Palo Pinto6,464-4,782
Twin Peaks7,401-5,719

Perforations

Perforated and open-hole intervals.

FromToType
8,4458,452Perforated
8,7449,056Perforated
8,7629,056Perforated
9,17410,088Perforated
10,10610,632Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37540517.5475 S
5.510,7497.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 16, 2007Mar 16, 2007—
00Sep 27, 2006Jun 1, 2006Yes
00Jun 7, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10130640, documented in the API reference.