WELL · 42-101-30703 · DISTRICT 8

Charles Havins #1

Y

Cottle County · Stescott (Canyon) field · Producing  · Vertical

Charles Havins #1 (API 42-101-30703) is a well in Cottle County operated by Mwl Energy LLC, completed December 22, 2010 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 24, 2010, permitted to 4,900 ft.

It was permitted by Nagual Exploration LLC and has since transferred to Mwl Energy LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Cisco, Bunger Lime Stone, Canyon.

Its lease has reported 222K barrels of oil and 2.68K mcf of gas since December 2010, last reporting in July 2026.

Operator of record

MWL Energy LLC

Permitted by Nagual Exploration LLC; the EWA schedule now lists a different operator.

Hamlin, TX · P-5 Y, filed Jun 4, 2026 · (254) 541-6390

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMWL Energy LLC
Production reportsMWL Energy LLCthrough Apr 2026
Latest permitNagual Exploration LLCAug 24, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,900
total depth, ft
1
permits on file
Aug 24, 2010
last permit issued
Dec 22, 2010
completed
222K
cumulative oil, bbl
2.68K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 22, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Charles Havins O-11-69673Stescott (Canyon)MWL Energy LLC1222K2.68KDec 2010 – Jul 2026

Oil, barrels lease total

Last 12 months 4,312 · prior 12 5,864(-26%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Nagual Exploration LLCJan 2011 → Dec 2020
  2. 2MWL Energy LLCJan 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
700935-99DrillNagual Exploration LLCAug 19, 2010Aug 24, 2010Nov 14, 20104,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-69673————

Formation tops

As filed on W-2/G-1. Subsea from 1,859 ft elevation.Download CSV →

FormationMD ftSubsea
Cisco3,249-1,390
Bunger Lime Stone3,966-2,107
CanyonCANYON LIME STONE4,460-2,601

Perforations

Perforated and open-hole intervals.

FromToType
4,4794,482Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62533012.25200 S
5.54,5457.875110 S
5.254,5457.875180 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 17, 2011Jan 5, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10130703, documented in the API reference.