TEXAS · WELLS · CRANE COUNTY · API 42-103-32210 · DISTRICT 7B

Tubb J. B. a/C 2 #213

Shut in

Crane County · Sand Hills (Tubb) field · Shut In  · Vertical

Fields on the latest permit · any of 2
Sand Hills (McKnight) · Sand Hills (Tubb)
Not one formation; the well must be completed in one of them, and no target formation is stated.

Tubb J. B. A/C 2 #213 (API 42-103-32210) is a well in Crane County operated by Formentera Operations LLC, completed June 6, 2003 and listed as shut in on the RRC schedule, shut in February 1, 2024.

The RRC has issued one drilling permit, issued January 11, 1980, permitted to 4,720 ft.

It was permitted by Exxon Corp. and has since transferred to Formentera Operations LLC on the wellbore schedule.

Completion filings report 2 formation tops, including McKnight, Tubb.

Its 2 leases have reported 373K barrels of oil and 3.41M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 49 wells, so these are lease totals, not this well alone.

Operator of record

Formentera Operations LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Austin, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 11, 2026
Permits on file
93
Phone
(512) 514-5779

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFormentera Operations LLC
Production reportsFormentera Operations LLCthrough Apr 2026
Latest permitExxon Corp.Jan 11, 1980

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,720
total depth, ft
1
permits on file
Jan 11, 1980
last permit issued
Jun 6, 2003
completed
373K
cumulative oil, bbl
3.41M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 6, 2003
Shut in
Feb 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 49 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tubb, J. B. a/C #2 O-10-12929Sand Hills (McKnight)Formentera Operations LLC2583.8K774KJan 1993 – Apr 2026
Tubb, J. B. a/C 2 O-10-5296Sand Hills (Tubb)Formentera Operations LLC24289K2.63MJan 1993 – Jan 2024

Oil, barrels lease total

Last 12 months 545 · prior 12 627(-13%)

050100202420252026

Gas, mcf lease total

Last 12 months 656 · prior 12 592(+11%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Oct 2004
  3. 3Apache CorporationNov 2004 → Jun 2021
  4. 4Slant Operating, LLCJul 2021 → Oct 2023
  5. 5Formentera Operations LLCNov 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
69407-99DrillExxon Corp.Jan 11, 1980Jan 11, 1980Feb 18, 19804,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 6, 2003Tubb J. B. a/C 2 O-10-5296Sand Hills (Tubb)Formentera Operations LLCShut In · shut in Feb 1, 20244,720
Jul 12, 1993Tubb J. B. a/C #2 O-10-12929Sand Hills (McKnight)Formentera Operations LLCNot on Schedule—
Mar 10, 1980Tubb J. B. a/C #2 O-10-12929Sand Hills (McKnight)Formentera Operations LLCNot on Schedule—
Mar 6, 1980Tubb J. B. a/C 2 O-10-5296Sand Hills (Tubb)Formentera Operations LLCNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,583 ft elevation.Download CSV →

FormationMD ftSubsea
McKnight2,949-366
Tubb4,256-1,673

Perforations

Perforated and open-hole intervals.

FromToType
2,9653,222Perforated
2,9653,456Perforated
4,2784,595Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7554313.75300 S
1.52,875——
2.8753,5917.875—
2.8753,591——
2.3754,200——
4.54,6889.51,630 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 2005Aug 21, 2003—
00Mar 3, 1994Nov 12, 1993—
00Jan 10, 1994Sep 10, 1993—
00Nov 24, 1993——
00Aug 2, 1984Jul 10, 1984—
00Jul 31, 1984Jul 10, 1984—
00Jan 12, 1984Apr 2, 1980—
00Jan 12, 1984Mar 28, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.