WELL · 42-103-34524 · DISTRICT 8

Caprock TXL #2J

Plugged

Crane County · Darlin (Strawn) field  · Vertical

Caprock Txl #2J (API 42-103-34524) is a plugged well in Crane County, plugged March 10, 1999, last operated by Concho Resources Inc..

The RRC has issued 2 drilling permits between 1997 and 1998, permitted to 10,500 ft.

It was permitted by Costilla Energy, Inc. and has since transferred to Concho Resources Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Wlfcmp, Wolfcamp, Strawn, Bend.

Its 2 leases have reported 30K barrels of oil and 14.3K mcf of gas since May 1997, last reporting in April 1999. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Concho Resources Inc.

Permitted by Costilla Energy, Inc.; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Inactive (I)
P-5 last filed
Jul 21, 2003
Permits on file
138
Phone
(432) 683-7443

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleConcho Resources Inc.
Production reportsConcho Resources Inc.through Jan 1999
Latest permitCostilla Energy, Inc.Feb 5, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
2
permits on file
Feb 5, 1998
last permit issued
Jul 19, 1997
completed
30K
cumulative oil, bbl
14.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 1997 THROUGH Apr 1999

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 19, 1997
Shut in
—
Plugged
Mar 10, 1999

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Caprock TXL O-10-35630Buffalo Ridge (Wolfcamp)Concho Resources Inc.13.96K2.63KJan 1998 – Apr 1999
Caprock TXL O-10-35454Darlin (Strawn)Concho Resources Inc.226.1K11.7KMay 1997 – Mar 1999

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Costilla Energy, Inc.May 1997 → Nov 1998
  2. 2Concho Resources Inc.Dec 1998 → Jan 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
472980-99RecompletionCostilla Energy, Inc.Feb 5, 1998Feb 5, 1998Jan 6, 19989,220
462735-99DrillCostilla Energy, Inc.May 21, 1997May 21, 1997Jun 12, 199710,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-35454————
—— O-10-35630————

Formation tops

As filed on W-2/G-1. Subsea from 2,818 ft elevation.Download CSV →

FormationMD ftSubsea
Wlfcmp8,188-5,370
Wolfcamp8,188-5,370
Strawn9,223-6,405
Bend9,683-6,865

Perforations

Perforated and open-hole intervals.

FromToType
8,1888,283Perforated
9,2669,274Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37535517.5350 S
9.6254,60512.25400 S
5.59,8897.875875 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 12, 1998Feb 5, 1998Yes
00Mar 4, 1998——
00Oct 3, 1997Aug 5, 1997Yes
00Sep 26, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10334524, documented in the API reference.