TEXAS · WELLS · CRANE COUNTY · CORDONA LAKE CONSOLIDATED UNIT LEASE · API 42-103-34692 · DISTRICT 7B

Cordona Lake Consolidated Unit #151

Y

Crane County · Cordona Lake field · Injection  · Vertical

Cordona Lake Consolidated Unit #151 (API 42-103-34692) is a well in Crane County operated by Hilcorp Energy Company, completed May 22, 2012 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued October 7, 1999, permitted to 5,574 ft.

It was permitted by Exxon Corp. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 7 formation tops, including Yates, San Andres, San Angelo, Clear Fork.

Its lease has reported 11.7M barrels of oil and 40M mcf of gas since January 1993, last reporting in July 2026. The lease carries 176 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 59K barrels injected in the 12 months reported through June 2025.

Operator of record

Hilcorp Energy Company

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitExxon Corp.Oct 7, 1999

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,574
total depth, ft
1
permits on file
Oct 7, 1999
last permit issued
May 22, 2012
completed
11.7M
cumulative oil, bbl
40M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 22, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 176 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cordona Lake Consolidated Unit O-10-20582Cordona LakeHilcorp Energy Company17611.7M40MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 152,351 · prior 12 112,971(+35%)

010K20K202420252026

Gas, mcf lease total

Last 12 months 677,200 · prior 12 653,948(+4%)

050K100K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Mar 2000
  2. 2Exxon Mobil CorporationApr 2000 → Jun 2005
  3. 3XTO Energy Inc.Jul 2005 → Feb 2025
  4. 4Hilcorp Energy CompanyApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
488244-99DrillExxon Corp.Oct 6, 1999Oct 7, 1999Oct 23, 19996,500

Completions

CompletedLeaseFieldOperatorStatusDepth
May 22, 2012Cordona Lake Consolidated Unit O-10-20582Cordona LakeHilcorp Energy CompanyInjection5,574

Formation tops

As filed on W-2/G-1. Subsea from 2,329 ft elevation.Download CSV →

FormationMD ftSubsea
Yates1,387942
San Andres3,207-878
San Angelo3,207-878
Clear ForkUPPER CLEARFORK3,630-1,301
Clear ForkUPPER CLEARFORK3,692-1,363
Tubb3,970-1,641
Clear ForkLOWER CLEARFORK4,038-1,709
Wichita-AlbanyWICHITA/ALBANY4,425-2,096
Wichita-Albany4,430-2,101
DevonianDEVONIAN THIRTYONE5,305-2,976
Devonian5,306-2,977

Perforations

Perforated and open-hole intervals.

FromToType
5,3115,389Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62560212.25315 S
5.55,5747.8751,860 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 21, 2013Jun 7, 2012—
00Aug 1, 2005Feb 6, 2004—
00May 9, 2000Feb 24, 2000—
00Apr 19, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

59K
bbl, last 12 reported months
3.17M
bbl, all reported
Jun 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000089247H-1 InjectionActive2,5002,5505,100–5,720

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 58,993 · prior 12 164,169(-64%)

010K20K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10334692, documented in the API reference.