WELL · 42-103-35019 · DISTRICT 8

McKnight M. B. #126

Y

Crane County · Armer (6350) field · Partial Plug  · Vertical

Mcknight M. B. #126 (API 42-103-35019) is a well in Crane County operated by Williams Oil Company, completed September 13, 2004 and listed as partial plug on the RRC schedule.

The RRC has issued 3 drilling permits between 2004 and 2012, permitted to 6,400 ft.

Completion filings report 6 formation tops, including San Andres, Glorieta, Tubb, Wichita-Albany.

Its 3 leases have reported 479K barrels of oil and 1.81M mcf of gas since January 1993, last reporting in July 2026. The leases carry 29 wells, so these are lease totals, not this well alone.

Operator of record

Williams Oil Company

Midland, TX · P-5 Y, filed Oct 4, 2025 · 177 permits on file · (432) 967-1359

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWilliams Oil Company
Production reportsWilliams Oil Companythrough Apr 2026
Latest permitWilliams Oil CompanyMar 30, 2012
6,400
total depth, ft
3
permits on file
Mar 30, 2012
last permit issued
Sep 13, 2004
completed
479K
cumulative oil, bbl
1.81M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 13, 2004
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 29 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McKnight, M. B. O-10-11496Armer (Tubb)Williams Oil Company422.4K56.8KJan 1993 – Jul 2026
McKnight, M.B. O-10-28137Armer (Wichita-Albany)Williams Oil Company8129K558KJan 1993 – Jul 2026
McKnight, M. B. O-10-33498Armer (6350)Williams Oil Company17327K1.19MJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 8,641 · prior 12 8,996(-4%)

05001K202420252026

Gas, mcf lease total

Last 12 months 23,772 · prior 12 28,012(-15%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Williams Oil CompanyJan 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
734533-99RecompletionWilliams Oil CompanyFeb 23, 2012Mar 30, 2012May 7, 20126,400
605369-99RecompletionWilliams Oil CompanyAug 23, 2005Aug 24, 2005Aug 29, 20056,400
546828-99DrillWilliams Oil CompanyJun 14, 2004Jun 14, 2004Jun 21, 20046,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-11496————
—— O-10-28137————
—— O-10-33498————

Formation tops

As filed on W-2/G-1. Subsea from 2,710 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres3,245-535
Glorieta4,020-1,310
Tubb4,645-1,935
Wichita-AlbanyWICHITA ALBANY5,163-2,453
Wolfcamp5,950-3,240
Pre-Permian6,197-3,487

Perforations

Perforated and open-hole intervals.

FromToType
4,7624,772Perforated
4,7974,802Perforated
4,8324,842Perforated
5,4045,514Perforated
6,0946,096Perforated
6,1206,134Perforated
6,1806,190Perforated
6,2046,206Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62563712.25320 S
4.56,4007.875700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 6, 2013Jul 23, 2012—
00Jul 28, 2006Sep 15, 2005Yes
00Mar 28, 2006Sep 28, 2004Yes
00Mar 28, 2006——
00Jan 6, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10335019, documented in the API reference.