TEXAS · WELLS · CRANE COUNTY · MCKNIGHT-CROLEY LEASE · API 42-103-35696 · DISTRICT 7B

McKnight-Croley #3

Shut in

Crane County · Sand Hills (Tubb) field · Shut In  · Vertical

Mcknight-Croley #3 (API 42-103-35696) is a well in Crane County operated by Ring Energy Inc., completed June 14, 2010 and listed as shut in on the RRC schedule, shut in September 1, 2026.

The RRC has issued one drilling permit, issued November 25, 2009, permitted to 6,327 ft.

It was permitted by Devon Energy Production CO, L.P. and has since transferred to Ring Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Tubb, Wichita-Albany, Wolfcamp.

Its lease has reported 118K barrels of oil and 920K mcf of gas since February 2010, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Ring Energy Inc.

Permitted by Devon Energy Production Co, L.P.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Feb 9, 2026
Permits on file
997
Phone
(432) 682-7464

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRing Energy Inc.
Production reportsRing Energy, Inc.through Apr 2026
Latest permitDevon Energy Production Co, L.P.Nov 25, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,327
total depth, ft
1
permits on file
Nov 25, 2009
last permit issued
Jun 14, 2010
completed
118K
cumulative oil, bbl
920K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 14, 2010
Shut in
Sep 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
McKnight-Croley O-10-39964Sand Hills (Tubb)Ring Energy, Inc.3118K920KFeb 2010 – Jul 2026

Oil, barrels lease total

Last 12 months 2,172 · prior 12 2,719(-20%)

0200400202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 15,345(-100%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Devon Energy Production Co, L.P.Feb 2010 → Dec 2018
  2. 2Stronghold Energy II Oper, LLCJan 2019 → Aug 2022
  3. 3Ring Energy, Inc.Sep 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
687867-99DrillDevon Energy Production Co, L.P.Nov 24, 2009Nov 25, 2009May 14, 20106,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 14, 2010McKnight-Croley O-10-39964Sand Hills (Tubb)Ring Energy Inc.Shut In · shut in Sep 1, 20266,327

Formation tops

As filed on W-2/G-1. Subsea from 2,672 ft elevation.Download CSV →

FormationMD ftSubsea
Tubb4,380-1,708
Wichita-AlbanyWICHITA ALBANY4,954-2,282
Wolfcamp5,495-2,823

Perforations

Perforated and open-hole intervals.

FromToType
4,4804,698Perforated
4,9925,466Perforated
5,5436,068Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62562511230 S
5.56,3277.875620 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 8, 2011Nov 17, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10335696, documented in the API reference.