TEXAS · WELLS · CROCKETT COUNTY · API 42-105-00949 · DISTRICT 6E

Norman Johnson #1

Plugged

Crockett County · Refoil (3200 Sand) field  · Vertical

Norman Johnson #1 (API 42-105-00949) is a plugged well in Crockett County, plugged May 3, 2010, last operated by Chesapeake Operating Inc..

The RRC has issued one drilling permit, issued March 18, 2009, permitted to 9,620 ft.

Completion filings report 4 formation tops, including Refoil, Refoil (3200 Sand), Dean, Strawn.

Its 2 leases have reported 233 barrels of oil and 91K mcf of gas since January 1993, last reporting in January 2012. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Chesapeake Operating Inc.

Based in
Oklahoma City, OK
P-5 status
Delinquent (D)
P-5 last filed
Dec 10, 2024
Permits on file
13,061
Phone
(405) 935-3100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleChesapeake Operating Inc.
Production reportsChesapeake Operating, Inc.through Sep 2009
Latest permitChesapeake Operating, Inc.Mar 18, 2009
9,620
total depth, ft
1
permits on file
Mar 18, 2009
last permit issued
Jul 17, 2009
completed
233
cumulative oil, bbl
91K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2012

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 17, 2009
Shut in
—
Plugged
May 3, 2010

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Norman Johnson O-9-16926Refoil (3200 Sand)Chesapeake Operating, Inc.1233125Mar 2009 – Jan 2012
Johnson, Norman G-9-64833Hunt-Baggett, W. (Strawn)Chesapeake Operating, Inc.1090.9KJan 1993 – Dec 2009

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyJan 1993 → Apr 1994
  2. 2Sonat Exploration Company -TylerMay 1994 → Nov 1994
  3. 3Sonat Exploration Co. - MidlandDec 1994 → Mar 1999
  4. 4Rising Star Energy, L.L.C.Apr 1999 → Feb 2000
  5. 5Ricks Exploration, Inc.Mar 2000 → Dec 2003
  6. 6Concho Exploration IncJan 2004 → Mar 2004
  7. 7Chesapeake Operating, Inc.Apr 2004 → Sep 2009

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
679623-99RecompletionChesapeake Operating, Inc.Mar 18, 2009Mar 18, 2009Mar 18, 20099,620

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 17, 2009Norman Johnson O-9-16926Refoil (3200 Sand)Chesapeake Operating Inc.Plugged—
Oct 18, 1975Johnson Norman G-9-64833Hunt-Baggett W. (Strawn)Chesapeake Operating Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,364 ft elevation.Download CSV →

FormationMD ftSubsea
Refoil3,210-846
Refoil (3200 Sand)3,210-846
Dean4,145-1,781
Strawn9,410-7,046

Perforations

Perforated and open-hole intervals.

FromToType
3,2083,230Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,04011—
4.59,6587.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 22, 2010Dec 8, 2009—
00Oct 23, 2009Apr 20, 2009Yes
00Jul 7, 2009——
00Jan 12, 1984Jan 21, 1976—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10500949, documented in the API reference.