WELL · 42-105-11008 · DISTRICT 7
Tippett 36 #2
Crockett County · Tippett W. (Wolfcamp 5500) field · Vertical
Tippett 36 #2 (API 42-105-11008) is a plugged well in Crockett County, plugged December 19, 2013, last operated by Shell Oil Company.
The RRC has issued 2 drilling permits between 1984 and 1995, permitted to 5,700 ft.
It was permitted by Shell Western E&P Inc. and has since transferred to Shell Oil Company on the wellbore schedule.
Completion filings report 4 formation tops, including San Andres, Glorieta, Leonard, Detrital.
Its 2 leases have reported 37K barrels of oil and 476K mcf of gas since January 1993, last reporting in July 2026. The leases carry 4 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Shell Western E&P Inc.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Jul 4, 2026 · 1,401 permits on file · (281) 787-6834
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Shell Oil Company |
| Production reports | Extex Operating Companythrough Apr 2026 |
| Latest permit | Shell Western E&P Inc.Nov 15, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,700
- total depth, ft
- 2
- permits on file
- Nov 15, 1995
- last permit issued
- —
- completed
- 37K
- cumulative oil, bbl
- 476K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Dec 19, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Tippett -36- O-9-14411 | Tippett (Clear Fork Lo.) | Extex Operating Company | 2 | 33.3K | 449K | Feb 1996 – Jul 2026 |
| Tippett 36 O-9-5388 | Tippett, West (Hueco) | Shell Western E&P Inc. | 2 | 3.75K | 26.3K | Jan 1993 – Aug 1996 |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Oil, barrels lease total
Last 12 months 244 · prior 12 307(-21%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Shell Western E&P Inc.Jan 1993 → Feb 1997
- 2Altura Energy Ltd.Mar 1997 → Dec 1998
- 3Rising Star Energy, L.L.C.Jan 1999 → Feb 2000
- 4Ricks Exploration, Inc.Mar 2000 → Dec 2003
- 5Concho Exploration IncJan 2004 → Mar 2004
- 6Chesapeake Operating, Inc.Apr 2004 → Mar 2010
- 7Three Rivers Operating Co LLCApr 2010 → Jul 2012
- 8COG Operating LLCAug 2012 → Dec 2012
- 9Legacy Reserves Operating LPJan 2013 → Jan 2021
- 10Extex Operating CompanyFeb 2021 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 440951-99 | Recompletion | Shell Western E&P Inc. | Oct 17, 1995 | Nov 15, 1995 | Jan 11, 1996 | 5,669 |
| 237604-99 | Other | Shell Western E&P Inc. | Mar 19, 1984 | Apr 26, 1984 | — | 5,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-5388 | — | — | — | — |
| — | — O-9-14411 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,250 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San AndresSAN ANDRE | 1,700 | 550 |
| San Andres | 1,700 | 550 |
| Glorieta | 2,160 | 90 |
| Leonard | 4,668 | -2,418 |
| Detrital | 4,911 | -2,661 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,309 | 4,553 | Perforated |
| 4,668 | 4,679 | Perforated |
| 4,879 | 5,004 | Perforated |
| 5,066 | 5,074 | Perforated |
| — | 5,509 | Perforated |
| — | 5,624 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 947 | 12.25 | 575 S |
| 7 | 5,700 | 8.75 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 21, 1996 | Jul 22, 1996 | Yes |
| 00 | Aug 14, 1996 | Apr 4, 1985 | — |
| 00 | Apr 29, 1985 | Apr 4, 1985 | — |
| 00 | Apr 12, 1985 | Apr 14, 1969 | — |
| 00 | Jan 12, 1984 | Apr 14, 1969 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-105-11008 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-105-11008 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 0
- bbl, all reported
- —
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000042895 | UIC Permit | Plugged Dec 30, 2013 | 0 | 0 | 0–0 |
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10511008, documented in the API reference.