WELL · 42-105-31892 · DISTRICT 9

State 28 #1

Plugged

Crockett County  · Vertical

State 28 #1 (API 42-105-31892) is a plugged well in Crockett County, plugged April 28, 1978, last operated by Texas Pacific Oil Company, Inc..

The RRC has issued one drilling permit, issued March 20, 1978, permitted to 9,850 ft.

Operator of record

Texas Pacific Oil Company, Inc.

Based in
Dallas, TX
P-5 status
Inactive (I)
Permits on file
589
Phone
(214) 373-0400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTexas Pacific Oil Company, Inc.Mar 20, 1978
9,850
total depth, ft
1
permits on file
Mar 20, 1978
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Apr 28, 1978

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
20549-99DrillTexas Pacific Oil Company, Inc.Mar 20, 1978Mar 20, 1978Mar 23, 19789,850

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2015
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000095957W-14 DisposalCanceled Jul 8, 20163,0002,0004,050–4,300

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120142015

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10531892, documented in the API reference.