TEXAS · WELLS · CROCKETT COUNTY · ROBERTSON 6A LEASE · API 42-105-33465 · DISTRICT 6E

Robertson 6A #1

Y

Crockett County · Ozona (Canyon Sand) field · Producing  · Vertical

Robertson 6a #1 (API 42-105-33465) is a well in Crockett County operated by R2q Operating LLC, completed July 3, 1981 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued June 16, 1981, permitted to 6,800 ft.

It was permitted by Indian Wells Oil Company and has since transferred to R2q Operating LLC on the wellbore schedule.

Its lease has reported 3 barrels of oil and 309K mcf of gas since January 1993, last reporting volume in March 2026.

Operator of record

R2Q Operating LLC

Permitted by Indian Wells Oil Company; the EWA schedule now lists a different operator.

Based in
Iowa Park, TX
P-5 status
Active – Extension (X)
P-5 last filed
Sep 12, 2025
Permits on file
38
Phone
(940) 228-1500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleR2Q Operating LLC
Production reportsExtex Operating Companythrough Mar 2026
Latest permitIndian Wells Oil CompanyJun 16, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,800
total depth, ft
1
permits on file
Jun 16, 1981
last permit issued
Jul 3, 1981
completed
3
cumulative oil, bbl
309K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 3, 1981
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Robertson 6A G-9-94249Ozona (Canyon Sand)Extex Operating Company13309KJan 1993 – Mar 2026

Gas, mcf lease total

Last 12 months 4,374 · prior 12 3,483(+26%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Parker & Parsley Development Co.Jan 1993 → Feb 1995
  2. 2Parker & Parsley Development L.PMar 1995 → Aug 1997
  3. 3Pioneer Natural Res. USA, Inc.Sep 1997 → Jun 2014
  4. 4Stanolind Operating LLCJul 2014 → Feb 2015
  5. 5Sogo III LLCMar 2015 → Jul 2017
  6. 6Stanolind Production LLCAug 2017 → Dec 2020
  7. 7Slant Operating, LLCJan 2021 → Jul 2021
  8. 8Extex Operating CompanyAug 2021 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
121337-99DrillIndian Wells Oil CompanyJun 16, 1981Jun 16, 1981Jun 2, 19816,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 3, 1981Robertson 6A G-9-94249Ozona (Canyon Sand)R2Q Operating LLCProducing6,800

Perforations

Perforated and open-hole intervals.

FromToType
6,6046,663Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,21311350 S
2.3756,545——
4.56,7987.875600 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 12, 1984Jul 23, 1981—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10533465, documented in the API reference.