TEXAS · WELLS · CROCKETT COUNTY · BAILEY, J. R. "A" LEASE · API 42-105-34638 · DISTRICT 6E

Bailey J. R. A #17

Shut in

Crockett County · Ozona NE. (Canyon 7520) field · Temp Abandoned  · Vertical

Bailey J. R. A #17 (API 42-105-34638) is a well in Crockett County operated by Zarvona Energy LLC, completed January 3, 1985 and listed as temp abandoned on the RRC schedule, shut in May 1, 2016.

The RRC has issued 2 drilling permits between 1983 and 1985, permitted to 8,713 ft.

It was permitted by Thompson, J. Cleo and has since transferred to Zarvona Energy LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Strawn, Detrital, Ellenburger.

No lease production has been reported under this well’s leases.

Operator of record

Zarvona Energy LLC

Permitted by Thompson, J. Cleo; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jun 2, 2026
Permits on file
98
Phone
(713) 600-0600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleZarvona Energy LLC
Production reportsZarvona Energy LLCthrough Apr 2016
Latest permitThompson, J. CleoSep 16, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,713
total depth, ft
2
permits on file
Sep 16, 1985
last permit issued
Jan 3, 1985
completed
0
cumulative oil, bbl
230K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2016

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 3, 1985
Shut in
May 1, 2016
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bailey, J. R. "A" G-9-118141Ozona, NE. (Canyon 7520)Zarvona Energy LLC10230KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Thompson, J. CleoJan 1993 → Jun 2008
  2. 2Approach Operating LLCJul 2008 → Apr 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
286457-99RecompletionThompson, J. CleoFeb 19, 1985Sep 16, 1985—8,713
218477-99DrillThompson, J. CleoDec 6, 1983Oct 25, 1983—8,713

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 3, 1985Bailey J. R. A G-9-118141Ozona NE. (Canyon 7520)Zarvona Energy LLCTemp Abandoned · shut in May 1, 20168,713
Nov 8, 1983Bailey J.R. A O-9-10417Ozona N. E. (Ellenburger)Thompson J. CleoNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,468 ft elevation.Download CSV →

FormationMD ftSubsea
Strawn8,604-6,136
Detrital8,664-6,196
Ellenburger8,700-6,232

Perforations

Perforated and open-hole intervals.

FromToType
7,5048,541Perforated
—8,713Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,52411300 S
2.3758,696——
4.58,7007.875700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 6, 1985Feb 15, 1985—
00Oct 8, 1985——
00Jan 12, 1984Nov 21, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10534638, documented in the API reference.