TEXAS · WELLS · CROCKETT COUNTY · RUTLEDGE LEASE · API 42-105-36068 · DISTRICT 6E
Rutledge #1
Crockett County · Carpenter NW (Wolfcamp) field · Vertical
Rutledge #1 (API 42-105-36068) is a plugged well in Crockett County, plugged December 21, 1997, last operated by Bass Enterprises Production CO..
The RRC has issued 2 drilling permits (amended once) between 1992 and 1997, permitted to 7,500 ft.
Completion filings report 5 formation tops, including T/Yates, T/Grayburg, T/Upper Wc Mkr, T/Devonian.
Its lease has reported 1.47K barrels of oil and 8.13K mcf of gas since January 1993, last reporting in April 1998.
Operator of record
Bass Enterprises Production Co.
- Based in
- Fort Worth, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Jan 25, 2006
- Permits on file
- 801
- Phone
- (817) 390-8400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bass Enterprises Production Co. |
| Production reports | Bass Enterprises Production Co.through Apr 1997 |
| Latest permit | Bass Enterprises Production Co.Mar 6, 1997 |
- 7,500
- total depth, ft
- 3
- permits on file
- Mar 6, 1997
- last permit issued
- May 9, 1992
- completed
- 1.47K
- cumulative oil, bbl
- 8.13K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 1998
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 9, 1992
- Shut in
- —
- Plugged
- Dec 21, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rutledge O-9-13275 | Carpenter, NW (Wolfcamp) | Bass Enterprises Production Co. | 1 | 1.47K | 8.13K | Jan 1993 – Apr 1998 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bass Enterprises Production Co.Jan 1993 → Apr 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 459411-99 | Recompletion | Bass Enterprises Production Co. | Mar 4, 1997 | Mar 6, 1997 | — | 6,760 |
| 397520-98 | Drill | Bass Enterprises Production Co. | Jun 17, 1992 | Mar 18, 1992 | — | 7,500 |
| 397520-99 | Drill | Bass Enterprises Production Co. | Mar 16, 1992 | Mar 18, 1992 | Apr 15, 1992 | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 9, 1992 | Rutledge O-9-13275 | Carpenter NW (Wolfcamp) | Bass Enterprises Production Co. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,260 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Yates | 685 | 1,575 |
| T/Grayburg | 1,328 | 932 |
| T/Upper WC MKR | 5,082 | -2,822 |
| T/Devonian | 6,549 | -4,289 |
| B/Devonian | 6,573 | -4,313 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,465 | 6,478 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 11.75 | 953 | 14.75 | 830 S |
| 5.5 | 6,762 | 7.875 | 1,407 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 28, 1992 | Jul 15, 1992 | Yes |
| 00 | Jun 29, 1992 | Jun 3, 1992 | Yes |
| 00 | Jun 24, 1992 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-105-36068 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-105-36068 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10536068, documented in the API reference.