TEXAS · WELLS · CROCKETT COUNTY · DANIEL, M. K. "A" LEASE · API 42-105-37767 · DISTRICT 01

Daniel M. K. A #2

Shut in

Crockett County · Simpson-Mann (Canyon) field · Producing  · Vertical

Daniel M. K. A #2 (API 42-105-37767) is a well in Crockett County operated by Wolfcamp Energy LLC, completed August 1, 1997 and listed as producing on the RRC schedule, shut in December 1, 2023.

The RRC has issued one drilling permit, issued July 8, 1997, permitted to 6,300 ft.

It was permitted by Enron Oil & Gas Company and has since transferred to Wolfcamp Energy LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Wolfcamp, Upr Canyon Sds..

No lease production has been reported under this well’s leases.

Operator of record

Wolfcamp Energy LLC

Permitted by Enron Oil & Gas Company; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Feb 2, 2026
Phone
(817) 456-2491

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWolfcamp Energy LLC
Production reportsWolfcamp Energy, LLCthrough Mar 2026
Latest permitEnron Oil & Gas CompanyJul 8, 1997

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,300
total depth, ft
1
permits on file
Jul 8, 1997
last permit issued
Aug 1, 1997
completed
0
cumulative oil, bbl
481K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1997 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 1, 1997
Shut in
Dec 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Daniel, M. K. "A" G-1-164287Simpson-Mann (Canyon)Wolfcamp Energy, LLC10481KAug 1997 – Jul 2026

Gas, mcf lease total

Last 12 months 370 · prior 12 0

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyAug 1997 → Sep 1999
  2. 2EOG Resources, Inc.Oct 1999 → Feb 2000
  3. 3Tema Oil and Gas CompanyMar 2000 → Nov 2017
  4. 4Hexp Operating, LLCDec 2017 → Oct 2025
  5. 5Wolfcamp Energy, LLCFeb 2026 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
464418-99DrillEnron Oil & Gas CompanyJun 30, 1997Jul 8, 1997Jul 13, 19977,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 1, 1997Daniel M. K. A G-1-164287Simpson-Mann (Canyon)Wolfcamp Energy LLCProducing · shut in Dec 1, 20236,300

Formation tops

As filed on W-2/G-1. Subsea from 2,311 ft elevation.Download CSV →

FormationMD ftSubsea
WolfcampWOLFCAMP SHALE3,030-719
Upr Canyon Sds.4,990-2,679

Perforations

Perforated and open-hole intervals.

FromToType
5,3365,483Perforated
5,5765,586Perforated
5,7825,780Perforated
5,9006,010Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,84411700 S
4.56,0697.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 26, 1997Aug 15, 1997Yes
00Sep 16, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10537767, documented in the API reference.