WELL · 42-105-39746 · DISTRICT 7

Tabasco 2 #1

N

Crockett County · Escondido (Ellenburger) field  · Vertical

Tabasco 2 #1 (API 42-105-39746) is a well in Crockett County operated by Eog Resources Inc., completed November 19, 2005.

The RRC has issued 2 drilling permits (amended once) between 2005 and 2006, permitted to 9,700 ft.

Completion filings report 5 formation tops, including Devonian, Fevonian, Fusselman, Ellenburger.

Its 2 leases have reported 131K barrels of oil and 208K mcf of gas since November 2005, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

EOG Resources Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Oct 2, 2025
Permits on file
16,348
Phone
(713) 651-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEOG Resources Inc.
Production reportsRed Stag Operating, LLCthrough Mar 2026
Latest permitEOG Resources, Inc.Jul 14, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,700
total depth, ft
3
permits on file
Jul 14, 2006
last permit issued
Nov 19, 2005
completed
131K
cumulative oil, bbl
208K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 19, 2005
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tabasco 2 O-9-15983Escondido (Fusselman)Red Stag Operating, LLC1125K208KJun 2006 – Jul 2026
Tabasco 2 O-9-15872Escondido (Ellenburger)EOG Resources, Inc.16.4K0Nov 2005 – Nov 2006

Oil, barrels lease total

Last 12 months 1,373 · prior 12 1,509(-9%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1EOG Resources, Inc.Nov 2005 → Mar 2013
  2. 2Thompson, J. CleoApr 2013 → Oct 2020
  3. 3Red Stag Energy, LLCNov 2020 → Mar 2021
  4. 4Red Stag Operating, LLCApr 2021 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
622332-99RecompletionEOG Resources, Inc.Jul 11, 2006Jul 14, 2006May 16, 20069,420
605086-98DrillEOG Resources, Inc.Jan 12, 2006Aug 18, 2005Sep 30, 20059,700
605086-99DrillEOG Resources, Inc.Aug 17, 2005Aug 18, 2005Sep 30, 20059,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-9-15872————
—— O-9-15983————

Formation tops

As filed on W-2/G-1. Subsea from 2,587 ft elevation.Download CSV →

FormationMD ftSubsea
Devonian8,520-5,933
Fevonian8,520-5,933
Fusselman8,865-6,278
Ellenburger9,280-6,693
Estimated Tops——

Perforations

Perforated and open-hole intervals.

FromToType
8,8428,856Perforated
9,2839,420Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
11.7568514.75960 S
8.6253,22811675 S
5.59,2837.8751,482 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 9, 2006Jul 18, 2006Yes
00Jul 26, 2006Jan 20, 2006Yes
00May 24, 2006Jan 20, 2006Yes
00Feb 14, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10539746, documented in the API reference.