TEXAS · WELLS · CROCKETT COUNTY · CONOCO POWELL GMS DEEP LEASE · API 42-105-39998 · DISTRICT 6E

Conoco Powell GMS Deep #10

Shut in

Crockett County · World East (Strawn) field · Producing  · Vertical

Conoco Powell Gms Deep #10 (API 42-105-39998) is a well in Crockett County operated by Hilcorp Energy Company, completed June 23, 2006 and listed as producing on the RRC schedule, shut in July 1, 2026.

The RRC has issued one drilling permit, issued May 24, 2006, permitted to 8,445 ft.

It was permitted by Pogo Producing Company and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Yates, Wolfcamp, Strawn, Ellenburger.

Its lease has reported 2.53K barrels of oil and 1.09M mcf of gas since June 2006, last reporting volume in February 2026.

Operator of record

Hilcorp Energy Company

Permitted by Pogo Producing Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Feb 2026
Latest permitPogo Producing CompanyMay 24, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,445
total depth, ft
1
permits on file
May 24, 2006
last permit issued
Jun 23, 2006
completed
2.53K
cumulative oil, bbl
1.09M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2006 THROUGH Feb 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 23, 2006
Shut in
Jul 1, 2026
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Conoco Powell GMS Deep G-9-219246World, East (Strawn)Hilcorp Energy Company12.53K1.09MJun 2006 – Feb 2026

Gas, mcf lease total

Last 12 months 1,843 · prior 12 781(+136%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pogo Producing CompanyJul 2006 → Jan 2008
  2. 2Pogo Producing Company LLCFeb 2008 → Feb 2008
  3. 3OXY USA Inc.Mar 2008 → Feb 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
619809-99DrillPogo Producing CompanyMay 24, 2006May 24, 2006May 28, 20069,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 23, 2006Conoco Powell GMS Deep G-9-219246World East (Strawn)Hilcorp Energy CompanyProducing · shut in Jul 1, 20268,445

Formation tops

As filed on W-2/G-1. Subsea from 2,830 ft elevation.Download CSV →

FormationMD ftSubsea
Yates1,6481,182
Wolfcamp6,420-3,590
Strawn8,058-5,228
Ellenburger8,218-5,388

Perforations

Perforated and open-hole intervals.

FromToType
8,0588,092Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37594017.51,050 S
8.6253,303111,220 S
5.58,4457.8751,200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Feb 6, 2007Jul 27, 2006Yes
00Sep 21, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.