WELL · 42-105-40802 · DISTRICT 7
Graham Ranch #3A
Crockett County · Noelke (Wolfcamp Lower) field · Directional
Graham Ranch #3A (API 42-105-40802) is a plugged well in Crockett County, plugged March 28, 2018, last operated by Bustamante Oil Company.
The RRC has issued one drilling permit, issued July 30, 2008, permitted to 8,100 ft.
It was permitted by Finley Resources, Inc. and has since transferred to Bustamante Oil Company on the wellbore schedule.
Completion filings report 3 formation tops, including Wolfcamp, Canyon, Ellenburger.
Its lease has reported 9.35K barrels of oil and 22.4K mcf of gas since June 2007, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Finley Resources, Inc.; the EWA schedule now lists a different operator.
Midland, TX · P-5 Y, filed May 4, 2026 · 4 permits on file · (432) 664-1103
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Bustamante Oil Company |
| Production reports | Finley Resources, Inc.through Nov 2011 |
| Latest permit | Finley Resources, Inc.Jul 30, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,100
- total depth, ft
- 1
- permits on file
- Jul 30, 2008
- last permit issued
- Aug 3, 2008
- completed
- 9.35K
- cumulative oil, bbl
- 22.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2007 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 3, 2008
- Shut in
- —
- Plugged
- Mar 28, 2018
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Graham Ranch O-9-16573 | Noelke (Wolfcamp, Lower) | Bustamante Oil Company | 3 | 9.35K | 22.4K | Jun 2007 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Finley Resources, Inc.Jun 2007 → Nov 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 667854-99 | Drill | Finley Resources, Inc. | Jul 29, 2008 | Jul 30, 2008 | Jul 10, 2008 | 8,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-9-16573 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,819 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| WolfcampWOLFCAMP REEF | 5,760 | -2,941 |
| Canyon | 6,307 | -3,488 |
| Ellenburger | 7,038 | -4,219 |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 837 | 17.5 | — |
| 8.625 | 1,754 | 11 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 14, 2009 | Feb 5, 2009 | Yes |
| 00 | Apr 9, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-105-40802 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-105-40802 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10540802, documented in the API reference.