TEXAS · WELLS · CROCKETT COUNTY · API 42-105-40952 · DISTRICT 7C

University 45-8 #2

Plugged

Crockett County  · Vertical

University 45-8 #2 (API 42-105-40952) is a plugged well in Crockett County, plugged March 11, 2011, last operated by Approach Operating LLC.

The RRC has issued 2 drilling permits between 2008 and 2011, permitted to 9,000 ft.

Operator of record

Approach Operating LLC

Based in
Fort Worth, TX
P-5 status
Delinquent (D)
P-5 last filed
Nov 15, 2019
Permits on file
1,045
Phone
(817) 989-9000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitApproach Operating LLCFeb 11, 2011
9,000
total depth, ft
2
permits on file
Feb 11, 2011
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 11, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
709895-99ReenterApproach Operating LLCFeb 8, 2011Feb 11, 2011Mar 8, 20119,000
676286-99DrillApproach Operating LLCDec 12, 2008Dec 17, 2008Jan 12, 20099,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10540952, documented in the API reference.