TEXAS · WELLS · CROSBY COUNTY · HANCOCK, FRANK LEASE · API 42-107-30868 · DISTRICT 7B

Hancock Frank #I2

Plugged

Crosby County · Hoople (Clear Fork) field  · Vertical

Hancock Frank #I2 (API 42-107-30868) is a plugged well in Crosby County, plugged May 21, 2009, last operated by Juno Operating Company Iii LLC.

The RRC has issued one drilling permit, issued August 11, 1986, permitted to 4,600 ft.

It was permitted by Socorro Exploration, Inc. and has since transferred to Juno Operating Company Iii LLC on the wellbore schedule.

Completion filings report one formation top, including Clear Fork.

Its lease has reported 340K barrels of oil and 65.8K mcf of gas since January 1993, last reporting in July 2026. The lease carries 12 wells, so these are lease totals, not this well alone.

Operator of record

Juno Operating Company III LLC

Permitted by Socorro Exploration, Inc.; the EWA schedule now lists a different operator.

Based in
Plano, TX
P-5 status
Active (A)
P-5 last filed
Mar 19, 2026
Permits on file
111
Phone
(214) 239-3950

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJuno Operating Company III LLC
Production reportsJuno Operating Company III, LLCthrough Mar 2026
Latest permitSocorro Exploration, Inc.Aug 11, 1986

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,600
total depth, ft
1
permits on file
Aug 11, 1986
last permit issued
Jun 12, 1987
completed
340K
cumulative oil, bbl
65.8K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 12, 1987
Shut in
—
Plugged
May 21, 2009

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 12 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hancock, Frank O-11-64394Hoople (Clear Fork)Juno Operating Company III, LLC12340K65.8KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 558 · prior 12 705(-21%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Hallwood Petroleum, Inc.Jan 1993 → Mar 1996
  2. 2Xeric Oil & Gas CorporationApr 1996 → Jul 1997
  3. 3Stealth Oil Corp.Aug 1997 → May 1998
  4. 4Aoco Operating Company, L.L.C.Jun 1998 → Feb 2005
  5. 5Aoco Operating, L.P.Mar 2005 → Feb 2007
  6. 6Juno Operating Company, LLCMar 2007 → Jun 2011
  7. 7Sheridan Production Company, LLCJul 2011 → Mar 2020
  8. 8FDL Operating, LLCApr 2020 → Feb 2021
  9. 9Juno Operating Company III, LLCJul 2021 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
305071-99DrillSocorro Exploration, Inc.Aug 8, 1986Aug 11, 1986—4,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 12, 1987Hancock Frank O-11-64394Hoople (Clear Fork)Juno Operating Company III LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 3,060 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK4,391-1,331

Perforations

Perforated and open-hole intervals.

FromToType
4,3944,404Perforated
4,4084,422Perforated
4,4284,442Perforated
4,4474,453Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62535012.25225 S
4.54,5167.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 15, 1987Jul 6, 1987Yes
00Jul 11, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

73.1K
bbl, last 12 reported months
2.26M
bbl, all reported
Mar 2009
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000061329H-1 InjectionPlugged Jun 5, 20094001,2004,397–4,442

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 73,065 · prior 12 150,523(-51%)

05K10K15K20082009

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10730868, documented in the API reference.