TEXAS · WELLS · CROSBY COUNTY · API 42-107-31234 · DISTRICT 8A

Aoco-Hoople (Clearfork) Unit #776W

N

Crosby County  · Vertical

Aoco-Hoople (Clearfork) Unit #776W (API 42-107-31234) is a former disposal or injection well in Crosby County, last operated by Juno Operating Company, LLC; its UIC permit is no longer active.

The RRC has issued one drilling permit, issued June 21, 2010, permitted to 5,000 ft.

Operator of record

Juno Operating Company, LLC

Based in
Plano, TX
P-5 status
Inactive (I)
P-5 last filed
Aug 31, 2011
Permits on file
248
Phone
(918) 621-6533

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitJuno Operating Company, LLCJun 21, 2010
5,000
total depth, ft
1
permits on file
Jun 21, 2010
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
697856-99DrillJuno Operating Company, LLCJun 18, 2010Jun 21, 2010—5,000

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Mar 2014
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000102831H-1 InjectionCanceled Jul 8, 20148002,0004,150–1,600

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120132014

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10731234, documented in the API reference.