TEXAS · WELLS · CULBERSON COUNTY · API 42-109-31408 · DISTRICT 08

Castile 48 #1

Plugged

Culberson County  · Vertical

Castile 48 #1 (API 42-109-31408) is a plugged well in Culberson County, plugged November 17, 1981, last operated by Tenneco Oil CO..

The RRC has issued one drilling permit, issued February 27, 1980, permitted to 11,722 ft.

Operator of record

Tenneco Oil Co.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
May 30, 2007
Permits on file
863
Phone
(713) 757-3525

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitTenneco Oil Co.Feb 27, 1980
11,722
total depth, ft
1
permits on file
Feb 27, 1980
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Nov 17, 1981

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
73711-99DrillTenneco Oil Co.Feb 27, 1980Feb 27, 1980Apr 28, 198011,722

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Apr 2016
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000108464W-14 DisposalCanceled Dec 9, 201610,0001,1752,350–3,905

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120152016

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10931408, documented in the API reference.