TEXAS · WELLS · CULBERSON COUNTY · TRIKEN LEASE · API 42-109-31448 · DISTRICT 7B
Triken #1
Culberson County · Cottonwood Ranch (Morrow) field · Vertical
Triken #1 (API 42-109-31448) is a plugged well in Culberson County, plugged September 27, 2002, last operated by Maralo LLC.
The RRC has issued 2 drilling permits between 1981 and 1984, permitted to 13,155 ft.
It was permitted by Maralo, Inc. and has since transferred to Maralo LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Cherry Canyon, Wolfcamp, Morrow.
Operator of record
Permitted by Maralo, Inc.; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Oct 22, 2004
- Permits on file
- 23
- Phone
- (713) 622-5420
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Maralo LLC |
| Production reports | none |
| Latest permit | Maralo, Inc.Oct 30, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 13,155
- total depth, ft
- 2
- permits on file
- Oct 30, 1984
- last permit issued
- Dec 17, 1984
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Sep 2002
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 17, 1984
- Shut in
- —
- Plugged
- Sep 27, 2002
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Triken G-10-121104 | Cottonwood Ranch (Morrow) | Maralo, LLC | 1 | 0 | 0 | Jan 1993 – Sep 2002 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 256136-99 | Other | Maralo, Inc. | Oct 19, 1984 | Oct 30, 1984 | Nov 4, 1984 | 11,850 |
| 108357-99 | Drill | American Quasar Petroleum Co. | Feb 12, 1981 | Feb 12, 1981 | — | 13,155 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 17, 1984 | Triken G-10-121104 | Cottonwood Ranch (Morrow) | Maralo LLC | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,385 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Cherry Canyon | 3,340 | 45 |
| Wolfcamp | 8,354 | -4,969 |
| Morrow | 11,732 | -8,347 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,734 | 11,813 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 745 | — | 17 S |
| 10.75 | 3,480 | 12.25 | 200 S |
| 5.5 | 11,900 | 7.875 | 755 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 2, 1986 | Jun 11, 1985 | Yes |
| 00 | May 30, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-109-31448 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-109-31448 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10931448, documented in the API reference.