WELL · 42-109-32282 · DISTRICT 8

Hughes Kent Ranch State #2

Plugged

Culberson County · Golden Corral (Barnett Shale) field  · Horizontal

Hughes Kent Ranch State #2 (API 42-109-32282) is a plugged horizontal well in Culberson County, plugged March 1, 2021, last operated by Cinnabar Operating LLC.

The RRC has issued one drilling permit (amended twice), issued March 14, 2007, permitted to 9,000 ft.

It was permitted by Quicksilver Resources Inc. and has since transferred to Cinnabar Operating LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Delaware, Wolfcamp, Barnett, Missippian Lime.

Operator of record

Cinnabar Operating LLC

Permitted by Quicksilver Resources Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Feb 11, 2026
Permits on file
153
Phone
(817) 870-1940

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCinnabar Operating LLC
Production reportsCinnabar Operating, LLCthrough Oct 2019
Latest permitQuicksilver Resources Inc.Feb 1, 2008

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,000
total depth, ft
3
permits on file
Feb 1, 2008
last permit issued
Jan 3, 2008
completed
0
cumulative oil, bbl
53K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2007 THROUGH Feb 2021

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 3, 2008
Shut in
—
Plugged
Mar 1, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hughes Kent Ranch State G-10-253335Golden Corral (Barnett Shale)Cinnabar Operating, LLC1053KJan 2008 – Feb 2021
Hughes Kent Ranch G-10-251279WildcatQuicksilver Resources Inc.100Sep 2007 – Jan 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Quicksilver Resources Inc.Nov 2008 → Jun 2009
  2. 2Cinnabar Energy, Ltd.Dec 2013 → Dec 2014
  3. 3Cinnabar Operating, LLCJan 2015 → Oct 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
634765-97DrillQuicksilver Resources Inc.Sep 23, 2009Feb 1, 2008May 9, 20076,600
634765-98DrillQuicksilver Resources Inc.Jan 22, 2008Mar 14, 2007May 9, 20076,600
634765-99DrillQuicksilver Resources Inc.Mar 7, 2007Mar 14, 2007May 9, 20079,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-251279————
—— G-10-253335————

Formation tops

As filed on W-2/G-1. Subsea from 3,625 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware2,4081,217
WolfcampWOLFCAMP LIME4,740-1,115
BarnettBARNETT SHALE5,065-1,440
BarnettBARNETT SHALE5,070-1,445
Missippian Lime5,875-2,250
Missippian5,878-2,253
WoodfordWOODFORD SHALE5,917-2,292

Perforations

Perforated and open-hole intervals.

FromToType
5,2005,790Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37588717.51,190 S
76,0378.75165 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 3, 2010Oct 1, 2009Yes
00Feb 10, 2010Mar 5, 2008Yes
00Dec 10, 2009——
00Oct 1, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10932282, documented in the API reference.