WELL · 42-109-32340 · DISTRICT 8

Rustler Hills State 111-14 #1

WaterN

Culberson County · Wildcat field  · Horizontal

Rustler Hills State 111-14 #1 (API 42-109-32340) is a horizontal well in Culberson County operated by Carrizo (Permian) LLC, completed April 7, 2011.

The RRC has issued 2 drilling permits (amended twice) between 2010 and 2016, permitted to 11,000 ft.

Completion filings report 10 formation tops, including Rustler, Cherry Canyon, Brushy Canyon, Bone Spring.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 5.33M barrels injected in the 12 months reported through April 2025.

Operator of record

Carrizo (Permian) LLC

Houston, TX · P-5 Y, filed Feb 7, 2020 · 206 permits on file · (800) 301-5122

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCarrizo (Permian) LLC
Production reportsnone
Latest permitCarrizo (Permian) LLCMar 3, 2016
11,000
total depth, ft
4
permits on file
Mar 3, 2016
last permit issued
Apr 7, 2011
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 7, 2011
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rustler Hills State 111-14 SWD O-10-47620Ford, West (Wolfcamp)1920 Energy, LLC100May 2016 – Jul 2026
Rustler Hills State 111-14 O-10-43015WildcatCarrizo (Permian) LLC100Aug 2011 – May 2016

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
814109-99RecompletionCarrizo (Permian) LLCFeb 29, 2016Mar 3, 2016Apr 10, 20165,550
698023-97DrillDevon Energy Production Co, L.P.Oct 26, 2010Jun 25, 2010Sep 28, 201011,000
698023-98DrillDevon Energy Production Co, L.P.Jun 30, 2010Jun 25, 2010—11,000
698023-99DrillDevon Energy Production Co, L.P.Jun 23, 2010Jun 25, 2010Sep 28, 20107,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-43015————
—— O-10-47620————

Formation tops

As filed on W-2/G-1. Subsea from 3,252 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler3252,927
Cherry Canyon3,22626
Brushy Canyon4,466-1,214
Bone Spring1ST BONE SPRING LIME5,786-2,534
Atoka——
Bone SpringBONE SPRINGS——
Delaware——
DelawareFORD-DELAWARE——
Mississippian——
Morrow——
Rustler——
Strawn——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
2,9603,950Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3752,18517.52,215 S
9.6255,81011350 S
5.510,2328.751,495 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 29, 2024Jul 12, 2023—
00Oct 4, 2016Aug 16, 2016—
00May 31, 2016May 9, 2016—
00Aug 31, 2013Aug 13, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

5.33M
bbl, last 12 reported months
33.7M
bbl, all reported
Apr 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000113646W-14 DisposalActive20,0001,3502,700–5,500

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 5,330,651 · prior 12 5,506,624(-3%)

0200K400K600K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10932340, documented in the API reference.